(영문) 의정부지방법원 고양지원 2017.01.25 2015가단24952
공사대금
Text

1. The Defendant’s KRW 19,551,200 for the Plaintiff and 5% per annum from September 5, 2015 to January 25, 2017.

Reasons

1. On February 14, 2012, the Plaintiff (contractor) entered into a contract with the Defendant (contractor) for the following terms:

The name of the construction project (A: the name of the plaintiff and the defendant: the location of the new construction project (hereinafter referred to as the "building in this case"): The construction cost of C at the time of the strike: the construction period of KRW 1,595,00,000: the construction period of KRW 1,59: the construction cost of KRW 1,595,000: the defect repair liability period on February 14, 2012 and July 31, 2012: Article 26 (Defect security) of the

2. B shall repair all defects arising from the relevant construction works during the defect repair obligation period prescribed in this contract from the date of completion of the completion inspection.

5. If the defect of the construction works is attributable to the intention of Eul, the defect repair shall be carried out by Eul or the compensation shall be made even after the defect repair period has expired.

Article 34 (Compensation for Damages, etc.)

4. If a loss was incurred to A or a third party due to a breach of contract (such as an insolvent construction) by B after the completion of this project, B shall compensate for the loss.

As of November 2016, 2016, the outer wall of the instant building causes a defect that leaves part of the drum (hereinafter “instant defect”).

Since the dyke of the building outer wall of this case is confirmed to have constructed a string, rather than to have built a string in the main dyke, after the completion of the structural frame of the outer wall, it is not necessary to determine the building of a syke and the syke condition at the time of the installation of a syke, and it is not necessary to determine the syke of the syke, but to determine the flow flow from the outer wall at the time of the installation of a syke, but it is deemed to have excellent flown through the syke part of the external stairs room and the syke part generated from the syke part of the external

The attachment of the net container, which is constructed on the dr.e. d. d. d. d. d. d. d. d. d. d. d. d. d. d. d. d. d. d. d. d. d. d. e. d. d. d. d