Text
1. The Defendant: KRW 41,983,652 for the Plaintiff and KRW 5% per annum from April 12, 2013 to May 31, 2018.
Reasons
1. Occurrence of liability for damages;
A. Fact 1) B: (a) On April 12, 2013, 2013, C rocketing car (hereinafter “Defendant vehicle”) is the “Defendant vehicle”).
(B) Around 50-meter radius from the front of the Defendant’s vehicle, the Plaintiff’s driver’s vehicle driven along the center line while driving the instant road along the instant one-lane road at a point of approximately 50 meters in the direction of the west-gun of the west-gun in the direction of the west-gun. The Plaintiff’s driver’s Gyeong-dong, who was in progress on the front side of the Defendant’s vehicle, was shocked on the front part of the Defendant’s vehicle (hereinafter “instant accident”).
(2) The Plaintiff, who was on board the Maneman due to the instant accident, suffered from the injury of the right-hand knenee part part of the Maneneman.
3) The Defendant is an insurer that has entered into an automobile comprehensive insurance contract with respect to the Defendant vehicle. According to the fact of recognition of liability, the Defendant is liable for the damages suffered by the Plaintiff as an insurer of the Defendant vehicle as the insurer of the Defendant vehicle (based on recognition). [This ground] Fact that there is no dispute, Gap 1, 2, 3, 10 evidence, Eul evidence No. 1 (including the serial number, the purport
2. In addition to the matters stated below within the scope of liability for damages, each corresponding item of the Schedule of Calculation of Compensation for Damages shall be as follows, and in principle, the period for the convenience of calculation shall be calculated on a monthly basis, but less than the last month and less than KRW 1 shall be discarded.
The calculation of the current value at the time of the accident shall be based on the reduction rate of 5/12 percent per month to deduct the interim interest.
In addition, it is rejected that the parties' arguments are not stated separately.
Personal information 1) Personal data: The period of operation and income indicated in the annexed sheet for calculation of damages amount: 2) The urban daily wage should be calculated based on monthly 3,309,000 won, which is the average monthly income of male experience less than 3 to 5 years, among the income based on statistical income based on statistical income based on the employment-type employment status survey report.