logobeta
본 영문본은 리걸엔진의 AI 번역 엔진으로 번역되었습니다. 수정이 필요한 부분이 있는 경우 피드백 부탁드립니다.
텍스트 조절
arrow
arrow
(영문) 인천지방법원 2018.08.23 2017가단211473
기타(금전)
Text

1.(a)

The Defendant-Counterclaim Plaintiff (Counterclaim Defendant) is from March 31, 2017 to August 23, 2018.

Reasons

1. The principal lawsuit and counterclaim shall also be deemed to exist;

A. The Plaintiff is a stock company with the purpose of manufacturing machinery and appliances, etc., and the Defendant is a stock company with the purpose of manufacturing machinery and appliances, etc.

B. On January 21, 2016, the Plaintiff: (a) KRW 183,70,000 for the construction cost for D (D; hereinafter “instant facilities”) “production and installation works” (hereinafter “instant construction works”) included in D (D; hereinafter “instant facilities”), which is included in C projects ordered by the Defendant between the Defendant and the Defendant on January 21, 2016; (b) KRW 167,700,000 for the supply value = KRW 167,000 for the installation cost ( KRW 165,200,000 for the installation cost)

H. An advance payment is KRW 330,040,00 (excluding value-added tax), the intermediate payment is KRW 15,640,000,000,000 for the installation cost, and the remainder is KRW 10,8322,00,000 (excluding value-added tax), including the 10% of the installation cost and the S/V FE (= KRW 1,8322,00,00) for the construction period (hereinafter “instant contract”) and until April 30, 2016 (hereinafter “instant contract”).

(1) The term "special articles" is defined as follows:

1. The scope of supply of Eul (the plaintiff, hereinafter the same shall apply) is one of the terms and conditions of design [Basic Dring, Dring], materials-based production, inspection, packaging, delivery, S/V delivery, all of the terms and conditions of implementation.

2. Terms and conditions of production corresponding to the reference drawings, purchase specifications, and supply classification provided by Party A (the defendant, the same shall apply hereinafter);

3. B shall start a production after submitting a production drawing, including BD and D, and obtaining A’s approval.

4. At the request of Party A, Party B must dispatch SUPERVS on the designated date.

S/VE shall be KRW 1.8 million (excluding value-added tax) based on 10M/D standards.

The causes attributable to the conditions for the dispatch of personnel to guarantee the performance of facilities during installation and trial operation and the dispatch of personnel related to E and S/V UNTING

6.The detailed performance details of Section B shall be as follows:

No.1 & No. 2: SUPPORT on the entry side: No. 3 & No. 1999,99,99,90,000,000,000,000,000,000,000,000,000,000,000,000,00

arrow