(영문) 대전지방법원천안지원 2016.06.10 2014가합103629
손해배상(기)
Text

1. The defendant shall remove each drainage pipe and manle listed in the attached Table 1 list to the plaintiff A and B, and shall be listed in the attached Table 1 list.

Reasons

1. Basic facts

A. Plaintiff A and B are co-owners of the 621m2, G field 736m2, H field 89m2, I field 479m2, and the 885m2, prior to J (the ownership of Plaintiff A1/5 shares and Plaintiff B 4/5 shares) in Seo-gu, Seoan-gu, Seoan-gu, Seocheon-gu, Seoan-gu, Incheon, and the Plaintiff C is the owner of the 587m2m2, and Plaintiff D is the owner of the 672m2m2.

(2) In addition to the above I’s 479 square meters and J’s 885 square meters, “the instant land” is deemed to be “the instant land.” In addition to the above F F F 621 square meters, K 587 square meters, and L 672 square meters, the instant land is deemed to be “the instant land.” Plaintiff A has been operating a wedding hall with “ Q” from January 23, 199 to M land, N land, and a building (large part is located on the land) located on the O’s land (hereinafter “the instant wedding hall building”).

The land No. 1 and the land No. 2 of this case are located in the east of the P University No. 2 Campus (hereinafter referred to as the “Defendant No. 2 Campus”) under the jurisdiction of the Defendant, in the same manner, in the same manner, they are located outside the north, and the land No. 1 of this case is located outside the land No. 2 of this case, and the land No. 2 of this case is adjacent to the table of the Defendant Campus (hereinafter referred to as the “the table of this case”).

(See Attached Form 6 drawings). (c)

From June 30, 2005 to October 2005, the Defendant created the instant tennis to Defendant 2 Campus and performed large-scale banking operations.

In the construction process, the width of natural waterway between the instant wedding place and Defendant 2 campus was narrow, the Defendant, instead of natural waterway, set up an excellent waterway (hereinafter “instant excellent waterway”) at the place, and installed a drainage pipe and a fume pipe between the instant wedding place and the instant excellent pipe, thereby discharging rainwater at the instant wedding place.

Around July 20, 2010, rainwater discharged through the instant excellent pipelines was found to have been flown away from July 20, 2010, and the first floor of the instant wedding hall was flooded.

The above inundation is less than 'the inundation'.

arrow