logobeta
본 영문본은 리걸엔진의 AI 번역 엔진으로 번역되었습니다. 수정이 필요한 부분이 있는 경우 피드백 부탁드립니다.
텍스트 조절
arrow
arrow
(영문) 창원지방법원 마산지원 2013.10.02 2012고합45
업무상과실폭발성물건파열등
Text

Defendant

A shall be punished by imprisonment without prison labor for six months, and by imprisonment without prison labor for one year.

Reasons

Criminal facts

Defendant

A is the representative director of H in Gyeong-gun, Gyeong-gun, G, and Defendant B is the employee in charge of the construction of gas facilities at H, and H is the employee in charge of the construction of gas facilities at the Ha, Inc., H, around November 26, 2010, according to an agreement to conduct safety management related to the installation and maintenance of gas facilities while supplying liquefied petroleum gas (LPG) to the Haan-gun, Haan-nam, Haan-gun, G

Accordingly, Defendant B has a duty of care to ensure that gas leakage does not occur by safely connecting the ices that supply gas from liquefied petroleum gas supply pipelines to the gas boiler upon the residents’ request for the installation of a gas boiler, etc. by visiting the apartment room to the apartment room. Defendant A is a manager and operator of H, a stock company to which Defendant B belongs, and is obliged to thoroughly manage the safety of gas facilities when installing gas facilities through his employees.

Nevertheless, the Defendants jointly neglected the above duty of care and neglected the above duty of care on September 21, 201. Defendant A did not deliver the directions for the installation of new gas parts to Defendant B, and did not properly implement education to thoroughly implement gas safety management, such as repeatedly confirming the possibility of leakage, even if gas leakage was inspected after gas connection to the employees. Defendant B did not properly perform the duty of care by checking the possibility of leakage through a reduction. Defendant B’s request for gas boiler connection from the victim J (Y, 32 years of age) who was newly listed in the 18:10, 201, the 196-2, around 18:10, 201, at around 32: (a) connecting the gas boiler pipes of the gas boiler installed in the 801 multi-use room with the supply pipes of liquefied petroleum gas (LPG) with the gas gas supply pipes; and (b) connecting the combined parts with the gas boiler supply pipes (LPG). However, the crime of cutting down the combined parts with the air tank, etc.

arrow