Text
1. The plaintiff's claim is dismissed.
2. The costs of lawsuit shall be borne by the Plaintiff.
Reasons
1. Basic facts
A. On November 6, 2014, the Defendant held the site site conference for the supply of pumps related to the production of implied new products in the presence of the Plaintiff, etc. at the Defendant factory.
At the time, the Defendant's factory transferred the implied mixed land contained in the sprink to the sprink, using the pumps. However, the factory floor was connected with the sprink and the sprink because the factory floor was not flat.
In addition, the defendant explained that the point of an implied new product is higher than that of the existing implied product to the extent that it has been solided or solided, but since the completion of an implied new product was not completed, the defendant provided the plaintiff with the mixed land of the above new product instead of the mixed land of the above new product.
B. On November 7, 2014, the Plaintiff sent a written estimate for implied transfer pumps to the Defendant by e-mail. The main contents of the said written estimate are as follows.
Sanitary Rotary Pump 1 set 단가 930만 원, Nego Price 880만 원(VAT 별도) (JEC Pump set 481만 원, Motor & Cover 94만 원, Accessories 355만 원) Operating condition For product : 어묵 temperature : 상온 ℃ viscosity : 200,000 CPS capacity : 800 L/hr (at 70 rpm) pressure : 0.3 kgf/㎠
C. On November 13, 2014, the Defendant sent to the Plaintiff an e-mail to attend the rop pumps electronic bid for tobacco supply as shown on the 17th of the same month. The main contents of the specifications attached to the e-mail (hereinafter “instant specifications”) are as follows.
Construction period: The construction period: from November 10, 2014 to December 19, 2014 (including five days of trial operation) - the operation at the time of the manufacture of a waterway pumps, the quantity of supply - the land pipe (50A) - the land pipe (50A), the leisure 3EA (where necessary, separate sharing of sampling reference/other official specifications), but the leisure and network cases are made only one set.
Pp: The site descriptions of the pumps shall be met when the site descriptions are confirmed.
General City Mayor - He shall manufacture and install 6-pump sp sp sp sp sp sp sp sp sp sp s (including 2ST/rinks)
-.