1. The Defendant’s KRW 61,125,490 as well as the Plaintiff’s annual rate from January 22, 2014 to December 8, 2017.

Reasons

1. Facts of recognition;

A. The Defendant is a company engaged in the manufacture and sale of automobile parts, and the Plaintiff was a person who joined the Defendant Company on September 5, 201 and served in the presses.

B. The Plaintiff, at the Defendant Company’s factory, was in charge of replacing the metal type in order to operate press machine and to manufacture other products, from the process of manufacturing a product by pressing the steel plate with a press machine if the steel plate, which is the main material of the product, is put on a gold-type machine, and then moving the product from AB robot to the next process.

C. On January 22, 2014, at around 18:40, the Plaintiff completed the production of LM 65171-2,000 (PNL-S/SIL INR, LH) products, which are vehicle parts, while working in the Defendant Company’s factory, and subsequently exchanged dispute over AB robots for the production of 6611-4,009 (HR PNL-FR END) the front left part of the vehicle.

AB robot was a device that had been exchanged for the original automatic dispute, but the exchange device was broken before the plaintiff became a member, before the plaintiff was in charge of the above work, the employees of the defendant company replaced the dispute of AB robot with the direct hand under the situation that the plaintiff did not suspend the process, and the plaintiff was engaged in the work in the same way as the appointed party did not suspend the process.

E. The plaintiff is placed on the posters that will be newly installed to dispute the exchange of AB robot arms. The plaintiff entered and work at the time of moving by the posters, and the left side side was omitted in the fin-flick flicker, which is located on the access road to the view posters while moving, and the plaintiff continued to move to the view posters, and thus, the plaintiff's body is at the wind where the left side is fast, with the wind where the left side is fast, and thus, the plaintiff suffered injury, such as the injury to the left side leger, the pelfr, the pelfral, the pelfral, the pelfr, the pelfral, the pelfral, the pelfral, the pelfral, the pelfral, and the gafral wave. (hereinafter "the disaster").