(영문) 전주지방법원 2015.04.29 2014가합4261
공사대금
Text

1. The Defendant’s KRW 132,669,880 for the Plaintiff and 6% per annum from July 9, 2014 to April 29, 2015.

Reasons

1. Basic facts

A. The Plaintiff is an individual entrepreneur engaged in the tesenal construction business in the trade name of “B,” and the Defendant operates a coffee specialty store with the trade name of “Kona Bes”, etc. for the purpose of chain business of food beverages, such as coffees.

B. Around May 2013, 2013, the Plaintiff is entitled to the C Point Construction Contract 1 (hereinafter “C Point Construction Contract”).

(2) The Plaintiff received from the Defendant a total of KRW 10,00,000,000,000, in total, as the construction cost of KRW 20,000 on May 14, 2013, and KRW 20,000 on May 22, 2013, and KRW 20,000 on May 31, 2013, and KRW 20,000 on May 31, 2013, and KRW 40,000 on June 40, 2013, and KRW 10,00,000 on July 24, 2013.

C. (1) On July 8, 2013, the Plaintiff: (a) the interior works of “Coinabine D” from the Defendant (hereinafter “D Point construction works”).

the construction has been completed upon contract with the following terms: Article 2 (Opening of the Project)

3. Period: July 10, 2013 to August 25, 2013.

4. The scope of construction works: It shall be limited to the construction works specified in the written contract between the plaintiff and the defendant and the final quotation.

(B) The total construction cost of Article 4 (The specification and Price of Facilities) (The specification and Price of the Facilities) shall be KRW 178,500,000, the corporate profits shall be KRW 10%, and the value-added tax shall be separate.

Provided, That the unit cost of construction shall be KRW 1,700,000,000.

Separate amount shall be limited to Article 7.

Except for the additional drawings and estimates specified in Article 7 (Modification or Additional Works), matters to be modified or additionally undertaken shall be entered into a separate contract with each other subject to mutual agreement.

2. The Plaintiff: (a) KRW 10,00,00 from the Defendant on July 8, 2013; (b) KRW 10,00,00,00 on July 17, 2013; and (c) KRW 10,00,00 on July 31, 2013; (b) KRW 10,00,000 on August 7, 2013; and (c) KRW 10,00,000 on August 14, 2013; and (d) KRW 10,00,00 on August 16, 2013; and (e) KRW 10,00,00 on August 23, 2013; and (e) KRW 10,00,00,00 on August 10, 203; and (e) KRW 70,09,00 on September 10, 2013;

arrow