logobeta
본 영문본은 리걸엔진의 AI 번역 엔진으로 번역되었습니다. 수정이 필요한 부분이 있는 경우 피드백 부탁드립니다.
텍스트 조절
arrow
arrow
(영문) 대전지방법원논산지원 2020.11.12 2020가단11981
소유권이전등기
Text

1. The defendant shall accept the non-party C on June 3, 2002, the machinery, such as the Seosan Branch of Daejeon District Court, on the 412m2 m2 in the mountain mountain.

Reasons

1. Basic facts

A. The registration of ownership transfer has been completed in the name of D. D. D. D. D. D. 412 square meters (hereinafter “the land of this case”) on September 5, 1978. The registration of ownership transfer was completed in the name of E on August 30, 1978. The registration of ownership transfer was completed in the name of F on March 16, 1985. The registration of ownership transfer was completed in the name of F on March 31, 1994 under G on March 23, 1994. The registration of ownership transfer was completed on June 3, 2002 under the name of the Defendant on May 31, 2002.

(The land No. 1 in this case was reduced from 413 square meters to 412 square meters due to division on June 4, 2008.

The land of this case, where the registration of ownership transfer was completed in the original C name, and the land of this case was divided into the land of this case on September 5, 1978 (the area of the land of this case was 589 square meters, but the area of the land of this case was 528 square meters due to the division on June 4, 2008). As to the land of this case 2, the registration of ownership transfer was completed on September 5, 1978 under the Plaintiff’s name on September 5, 1978.

C. On September 8, 1978, the Plaintiff completed the registration of preservation of ownership of the housing indicated as the building ledger and the “H cement brick structure and coagum 20 square meters in the cement brick structure and the coagum sap evaluation house” on the building register (hereinafter “instant housing”) and on the register, the Plaintiff is residing in the said housing register.

Unlike the indication on the building ledger or on the registry, the instant house is located on the ground of the attached Table 1, 2, 3, 4, 5, 6, 7, 8, 9, 10, 11, 12, 13, 14, 15, 16, 17, 18, 19, 20, and 169 square meters (hereinafter “the portion of the instant house”) connected in each point of the attached Table 1 among the instant land.

arrow