(영문) 서울고등법원 2015.07.09 2014나2023551
손해배상(기)
Text

1. The plaintiff's appeal is all dismissed.

2. The costs of appeal shall be borne by the Plaintiff.

Purport of claim and appeal

The first instance court.

Reasons

1. Basic facts

A. The Plaintiff is a company engaged in the production and sales business of ready-mixeds. The Defendants are co-contractors who entered into a contract on the main facilities of the 1, 2nd unit nuclear power located in Soulgjin-gun, Chungcheongnam-gun, Chungcheongnam-do, Seoul (hereinafter “Korea hydroelectric Power Co., Ltd.”) with the Korea hydroelectric Power Co., Ltd. (hereinafter “Korea hydroelectric Power Co., Ltd.”) for the main facilities of the 1, 2nd unit (hereinafter “instant main facilities”).

B. On September 7, 2010, the Plaintiff entered into a service contract for concrete production works between the Plaintiff and the Defendants (i.e., the conclusion of a service contract for concrete production works) and the Defendants for concrete production works necessary for the instant main production works (hereinafter “instant concrete works”).

(2) On September 7, 2010, the Plaintiff entered into a service contract with the Defendants to produce and transport necessary quantity of concrete during the construction period from September 7, 2010 to December 31, 2011 (hereinafter “instant contract”), and thereafter, the instant contract was modified to add a certain quantity of concrete during the construction period until December 31, 201, as a result of the extension of the construction period, until December 31, 2016.

3) 이 사건 계약의 체결 당시 이 사건 계약서에 첨부된 분할계약내역서에 의하면, 원고는 콘크리트 생산설비의 설치 및 철거, 7가지 규격의 콘크리트 합계 1,196,665cy 입방야드(cubic yard)의 약칭으로 미국, 캐나다, 뉴욕에서 주로 사용되는 부피 단위이다. 의 생산 및 운반 등의 용역을 수행하기로 하되, 그 중 2000PSIф25 규격 제곱 인치 당 파운드(pounds-per-square inch 로 압력강도를...