logobeta
본 영문본은 리걸엔진의 AI 번역 엔진으로 번역되었습니다. 수정이 필요한 부분이 있는 경우 피드백 부탁드립니다.
텍스트 조절
arrow
arrow
(영문) 제주지방법원 2018.11.15 2018가단59009
제3자이의
Text

1. The plaintiff's claim is dismissed.

2. The costs of lawsuit shall be borne by the Plaintiff.

Reasons

1. Basic facts

A. On November 27, 2015, the Defendant filed a lawsuit against C for removal of a building and delivery of land by filing a lawsuit against C, Jeju District Court 2012da20429, which included the following order.

Although C filed an appeal and a final appeal against the above judgment, it became final and conclusive due to the dismissal of appeal and the rejection of hearing.

1. C shall be the Defendant:

(a) Part (2) of a building connected each point of 43, 2, 37, 38, 39, 40, 41, 42, and 43 on the ground of 658 square meters in Jeju-si, each point of 12.54 square meters in order to connect each point of 45, 40, 39, 46, 47, and 45 square meters in order to connect each point of 2.34 square meters in the building (3), 49, 50, 51, 52, 53, 21, and 49, the part (4), which connects each point of 27.13 square meters in the building, 50, 54, 26, 51, and 50 square meters in the same drawing, shall be (5), 45, 364, 26, 50 square meters in the building, 205, 261, and 50

(b) On the ground of 658 square meters in Jeju-si, the part (ii) of a stone fence connected in sequence of each point of 27,28, 29, 30, 31, 32, 33, 34, 35, 25, 26, and 27, the part (iii) of a stone fence connected each point of 36, 37, 38, 39, 40, 30, 30, 30, 30, 29, and 36, the part (ii) of a stone fence connected each point of 38, 41, 42, 43, 44, 39, and 38 square meters in sequence, and the part (3) of a stone fence fence connected each point of 45,46, 47, 48, 45, 51, 545, 51, 545, 51, 54, and 38;

C. Of the area of 658 square meters in Jeju-si, Jeju-si, the part (1) in the ship connecting each point of the attached Form 1, 2, 3, 4, 22, 23, 24, 25, 26, 27, 28, 29, 30, 31, 32, 33, 34, 18, 19, 20, 21, 21, and 152 square meters in sequence, among the area of 658 square meters in attached Form 3, the part (1) in the attached Form 3 shall be delivered to the ship (hereinafter referred to as "land subject to delivery"), and the latter shall be written (a).

B. C is December 14, 2015.

arrow