(영문) 서울중앙지방법원 2018.08.30 2016가합562835
공사대금
Text

1. The defendant,

A. As to KRW 2,388,518,424 and 201,00,000 among them, Plaintiff A Co., Ltd.:

Reasons

1. Basic facts

A. Plaintiff A Co., Ltd. (hereinafter “Plaintiff A”) is a corporation with the purpose of construction business, etc., Plaintiff B Co., Ltd. (hereinafter “Plaintiff B”) is a corporation with the purpose of road packaging business, etc., and the Defendant is a corporation with the purpose of construction and management of railroad facilities under the Framework Act on Railroad Industry Development and the Korea Rail Network Authority Act.

B. The Plaintiffs (hereinafter “Plaintiffs”) shall conclude and modify the contract for construction works.

A) Plaintiff A was the joint contractor of the Plaintiffs. The joint contractor of the Plaintiffs was the representative of the joint contractor of the Plaintiffs. On April 27, 2009, the joint contractor of the Plaintiffs was a construction with the Defendant and with the main content of the construction of the C Corporation (the total extension of approximately 8.49 km connecting D and E in e-mail) from the Defendant on April 27, 209 (hereinafter “instant construction”).

(1) A contract under which the total construction amount of KRW 93.84 billion and the total construction period from April 27, 2009 to April 25, 2014 (hereinafter referred to as “instant contract”) are to be awarded a contract for 1,825 days (hereinafter referred to as “instant contract”).

(1) The term “the instant construction contract” under the general conditions of the construction contract applicable to the instant contract (amended by the Defendant’s Accounting Rules 2200.04-18, December 29, 2008; hereinafter referred to as the “general conditions of the instant construction contract”).

(1) The counter-party to the contract shall commence construction works as stipulated in the contract document and shall submit to the ordering agency a report on commencement including the following documents at the commencement of construction works:

4. A plan for investment of human resources and equipment by work process. (2) When the other party to a contract needs to modify the documents submitted pursuant to paragraph (1) due to a design change or amendment to the terms and conditions of the contract, the other party shall submit

(3) A public official in charge of contracts shall be specified in paragraphs (1) and (2).