(영문) 광주지방법원해남지원 2017.05.16 2015가단21018
건물등철거 및 토지인도 등
Text

1. The defendant

A. Of 595 square meters in Jeonnam-gun, Jeonnam-gun C, each point of the attached Table 4, 5, 7, 8, 9, 13, and 4.

Reasons

1. Circumstances leading to the dispute of this case;

A. Division of land, preparation of a cadastral map, and acquisition of the Plaintiff’s ownership 1) D is limited to F from E on March 3, 1974, Jeonnam-gun (hereinafter “F”).

2) G Forest land is divided into seven parts of G forest land (hereinafter “G forest land before division”).

() After purchasing a part of the purchase with specifying the location and size, the part of the purchase part was leased to the Plaintiff with specifying the location and size [6 U.S. M. 180 square meters and 595 square meters] without completing the procedures for subdivision and ownership transfer registration (hereinafter “instant land”).

(2) The Plaintiff’s provisional building from the time of the lease of the instant land to be used as a spawn spawn spawn spawn spawn spas on the ground

(2) The construction of the G forest was planned to be divided into one square meter (7,141 square meter; hereinafter “G forest after the division”), two square meter (9,124 square meter; hereinafter “ hereinafter “H forest before the division”) of H forest 9 group 3, six square meters (180 square meter, 595 square meter; hereinafter the same shall apply) of the Plaintiff’s portion in the forestry map in the course of the measurement and division, on February 3, 1978, where the division of the G forest in question was conducted between E, D, and the Plaintiff, but the part of the instant land in the forestry map was planned to be divided into one part of the G forest before the division, which was part of the G forest in contact with the boundary of H forest and land before the division, but the surveying and division was conducted erroneously due to the part outside the G forest outside the boundary of the G forest before the division, which was conducted to be the registration conversion of land (hereinafter “30 square meter 15, 1981”).

3) On August 20, 1981, E completed the registration of transfer of ownership with respect to land C, and completed the registration of transfer of ownership with respect to H forests and fields before the division to the Plaintiff, and D completed the registration of transfer of ownership with respect to H forests and fields before the division to the J on December 30, 1992. 4) Thereafter, H forests and fields before the division were divided (hereinafter “H forests and fields”) on July 7, 1993, ① 7,472 square meters of H forests and fields (hereinafter “the land after division”), ② 826 square meters of I forests and fields, ③ K forest and fields.