Text
1. The Defendant’s KRW 26,286,075 as well as the Plaintiff’s annual rate from June 5, 2018 to August 14, 2019.
Reasons
1. Facts of recognition;
A. The relationship 1) The Plaintiff is a D insurance contract with C containing the following contents (hereinafter “instant insurance contract”).
(A) Insurance period: From August 26, 2014 to August 26, 2024, the name of collateral (building, loss) insurance: The subject matter of fire damage (building, loss) insurance: One story underground, three stories above ground (site size 378.6 square meters, building area 208.23 square meters; hereinafter “instant building”) located in Nam-gu Incheon Metropolitan City, which is owned by C: 300 million won; the Defendant does not keep both C and the Defendant, including approximately 56 square meters among the first floor of the instant building, on the ground that it is difficult to confirm which agreement was made with C on the scope of the leased object.
B leased and operated a factory of “F” from about 20 years ago.
Among the buildings of this case, the building that the defendant occupies as a factory (hereinafter referred to as the "factory of this case") is registered in the building ledger as "a shelter" and is separated from other parts of the building of this case, and the entrance door of this case is closed (hereinafter referred to as the "mail").
In the front and the rear side of the above party, the entrance was installed respectively, and the tent structure was covered with the roof that could not be known who was installed in the upper part of the above party, and three luminous facilities were installed.
(hereinafter “the instant tent.” The Defendant stored plastic bags, etc. for the manufacture of plastic bags in the instant marina, and in the said marina, the Defendant carried out electrical construction at his own expense for the use of lighting facilities.
Although the above party was adjoining to the factory of this case, it was necessary to pass through the entrance in order to move to another part of the building of this case.
B. On December 26, 2017, around 12:30 on December 26, 2017, the instant building was destroyed by fire in the instant tent (hereinafter “the instant fire”).