(영문) 춘천지방법원속초지원 2012.01.06 2010가합209 (1)
손해배상(공)
Text

1. The plaintiff's claim against the defendants is dismissed.

2. The costs of lawsuit shall be borne by the Plaintiff.

Reasons

1. Basic facts

A. The Plaintiff, who is engaged in the Plaintiff’s housework and hole farming business, is engaged in a housework production by holding a license for the marine seeds and seedlings production business (the license for the marine seeds and seedlings production business of 2005) from the Yangyang-gun of Gangwon-do from July 20, 2005 to July 19, 2010, which is able to produce housework seeds and seedlings from the Hanyang-gun of Yangyang-gun of Gangwon-do with the permission for the marine seeds and seedlings production business of 2005 (the license for the marine seeds and seedlings production of 2005). On February 11, 2008 from the Yangyang-gun of Gangwon-do to April 11, 2008 to April 22, 2013, and is engaged in a house farming business with the license for the fish farming business (the fish farming business).

(hereinafter referred to as the “instant aquaculture”). (b) The aquaculture operated by the Plaintiff.

On December 29, 2004, the Defendant Korea Highway Corporation (hereinafter referred to as the “Defendant Corporation”) awarded a contract to Defendant Hanyang Public Co., Ltd. (hereinafter referred to as the “Defendant Hanyang Public Co., Ltd.”) and to the Non-Party Hanyang Construction Co., Ltd. for construction works of Section 3 of the national expressway No. 65 line order J. J. J. J. J. J. Ha awarded a contract for construction works of Section 65 of the national highway No. 65 line from the 1006 to the 2008 unit of Yangyang-J. The construction works of bridge No. 1 and 2 Bridge at the Yongyangyang-gun located in the Yyangyangyangyangyangyangyangyangyang-gun Yangyangyangyang-do. (hereinafter referred to as the “construction works of this case”).

C. The geographical status of the instant cultivation site and the construction site near the instant construction site passes through Osancheon (Dongcheon). From the construction site of this case to the coastline, the distance of 5.5km from the site of the instant construction site to the lower port of Osancheon, and the instant cultivation site is approximately 1-2km away from the entrance of Osancheon to the north-west.

In 206 and 2008, the fingeryang-gun, Yangyang-gun, Yangyang-gun, Yangyang-gun, Yang a large amount of 223mm of the rainfall on July 15, 2006 and July 24, 2008.

E. Around April 8, 2009, the Plaintiff’s ruling by the Central Environmental Dispute Resolution Committee is the Defendants’ objection.