(영문) 부산지방법원동부지원 2020.08.18 2019가단201350
임금
Text

1. The plaintiff's claim is dismissed.

2. The costs of lawsuit shall be borne by the Plaintiff.

Reasons

Facts of recognition

C Around May 1, 2018, Co., Ltd. (hereinafter referred to as “C”) entered into a contract with D and one other, and subcontracted the construction of a new neighborhood living facility in Busan Jin-gu, Busan to the Defendant who is engaged in the construction business under the name of “F”.

Around that time, the Defendant re-subcontracted the above structural construction to G and H, but they did not complete the construction and suspended the construction.

Around August 30, 2018, the Defendant re-subcontracted the non-construction part of the above structural frame (hereinafter “instant construction”) to I Co., Ltd. (hereinafter “I”).

From August 30, 2018 to November 6, 2018, the Plaintiff invested parts and materials at the construction site of this case and carried out the instant construction.

During the above period, the Plaintiff prepared a printing log on the seal put into the construction site of this case, and the Director of the Field C confirmed that part of the said printing log corresponds to the number of inputs stated in the printing log and the actual number of inputs, and notified C and the Defendant thereof.

[Grounds] The facts without dispute, Gap 3 through 6 (including branch numbers; hereinafter the same shall apply), Eul 1 through 5, Eul's testimony, witness J's testimony, and the purport of the whole pleadings are asserted by the plaintiff. The defendant concluded a labor contract with the plaintiff when I suspended the construction without completion of the construction of the construction of this case. Although the plaintiff completed the construction of the plaintiff's input of human and material, 172,517,612 out of the amount of wages and material of the plaintiff and 78,530,00 and some of the parties agreed to be directly paid wages between Eul and Eul were paid 79,90,000 won after deducting the amount of steel products supplied by the supplier and 14,07,612 won (i.e., 172,517,612 won, 78,530, 708, 1608, 1608, 208).

Judgment

As seen earlier, the Plaintiff was involved in the instant case.