Defendant
A shall be punished by a fine of KRW 1,500,00, and by a fine of KRW 2,500,000, respectively.
The Defendants respectively.
Reasons
Punishment of the crime
D Co., Ltd. is a company that has received a contract for the production and installation of the stop stop stop s top stop s top s top stop s top s top stop s top stop s top s top stop s top s top s top s top s top s top s top s top s top s top s top s top s top s top s top s top ss top s top s top s top s top s top s top
The method of synthetic Apology used for the construction of this construction is composed of five synthetic liftss and five synthetic liftss necessary for the construction of a bridge, first of all in the construction of a bridge (1 step) and then combines (2 step) two existing Sparts by connecting two existing Sparts with each other, by building three synthetic Apcles and building concrete (2 step) after building the block, constructing the pole after building the bridge, and then building the bridge by building the bridge board with concrete, and then combining (3 step) between the two.
Accordingly, on July 25, 2012, the above company started to establish a bridge sub-project, and completed three combinations from around August 2, 2012, on or around August 2, 2012, but an accident occurred (the first accident), which was entered into by removing the support unit from the early negligence immediately after the combination is not installed, and four sub-sections are installed at the lower end of the bridge and four sub-sections, respectively.