(영문) 대구지방법원 2015.11.06 2014가단124729
손해배상(자)
Text

1. Defendant B’s KRW 34,803,394 as well as 5% per annum from June 9, 2014 to November 6, 2015, and the following.

Reasons

1. Determination as to the claim against the defendant B

A. 1) In fact, Defendant B entered into a subcontract for the construction of a new construction of D factory building in Daegu-gu, Daegu-gu (hereinafter “instant construction”) with respect to the construction of a new construction of D factory building (hereinafter “the instant construction”), Defendant B entered into a subcontract for the construction of reinforced concrete from Defendant C, the original office, the Seoul-gu Construction Corporation (hereinafter “Defendant C Construction”).

B) At around 13:00 on June 9, 2014, Defendant B, as part of the work described in paragraph (b) after completing a reinforced concrete building construction work at the above construction site, was carrying materials on the second floor of new buildings, such as wheels, water pumps, and pipes, onto freight cars. (C) Defendant B, as part of the work, combines about 100 pipe lines of 3 meters in length and about 100 pipe lines of 4 meters in length, and then, while loading on the Plaintiff’s 5-t truck operated by E, Defendant B, who did not carry a pipe, requested the Plaintiff that he loaded the pipe, who was able to carry on the 5-t truck, was loaded back to the right side of the Plaintiff, and the Plaintiff was bound by each of the instant materials to avoid any injury to the Plaintiff, such as the Plaintiff.

(2) In light of the circumstances revealed from the fact that there is no dispute, Gap evidence Nos. 1, Eul evidence Nos. 8-13, and 2 of the evidence Nos. 1, and the purport of the whole pleadings as to the recognition of liability, each of the above facts, and the circumstance of the accidents known from the recognition of liability, each pipe used to cover the steel lines with each pipe in the course of loading onto a cargo vehicle through a stack is likely to cause the relevant steel lines to have the strength to cope with the weight of each pipe.

arrow