(영문) 대전지방법원 2020.06.03 2020고단871
산업안전보건법위반
Text

Defendant

A shall be punished by imprisonment with prison labor for eight months, by a fine of five thousand won,00,000 won.

Defendant

Co., Ltd.

Reasons

Punishment of the crime

1. Defendant A

A. On March 19, 2019, the Defendant is the representative director of the “Stock Company B (B)”, a corporation established for the purpose of the operation of construction business on the second floor of the Seo-gu Daejeon-gu Daejeon, and the “B” is the general manager of the “Esung Party Education Center Remodeling” located in the Chungcheong-dong D, Chungcheongnam-do, 2019, which was performed from March 14, 2019, and is responsible for the fair management of construction and safety management of workers.

The business owner shall, at a place where workers might fall down as the end or opening of the work plate and passage, install a strong structure with sufficient strength protection measures, such as a safety field, vertical fall-off net, cover, etc., and in cases where it is extremely difficult to install a rail, etc., take measures necessary to prevent the fall risk, such as having workers wear a fall-off net, etc.

Nevertheless, on March 19, 2019, the Defendant, at the construction site of the said “Esung”, did not take necessary measures to prevent the fall risk, such as the installation of a rail or falling-off network, and the wearing of a safety belt, etc., while having workers under his/her jurisdiction work on a slope roof with a height exceeding 4.5 meters, and did not take necessary measures to prevent the fall risk, and thereby, he/she fell from a slope roof on March 19, 2019, and led to the death of multiple long-term damage.

(b) On March 20, 2019, a business owner of a regular supervision (1) on March 20, 2019 shall take necessary measures, such as fixing a part of the rain system to a solid facility or installing a dust string, etc. in order to prevent the vision, and in the case of works performed at the highest part of the rain system, a safety distress shall be installed.

Nevertheless, on March 20, 2019, the defendant around 1.0%.

In the construction site of the “Esung Party” as indicated in the port, the mobile mold is used, and fixed or set up a premium for the prevention of the entire city.