(영문) 대구지방법원 2014.09.04 2014고단1625
업무상과실치사등
Text

Defendant

A A shall be punished by imprisonment without prison labor for six months and by a fine of two hundred thousand won, and Defendant B shall be punished by imprisonment without prison labor for six months.

Defendant

A above.

Reasons

Punishment of the crime

1. The co-principal defendant A is a field manager at the E-Road Packing construction site, which is run in (State)D, and the defendant B is the representative director of G who subcontracted the removal of the F-existing bridge and the installation of a stuff bridge among the above construction site.

The Defendants, at around December 2013, performed the work of removing the existing bridge and installing the gambling bridge from the access road to the Cheongdo-gun, Cheongdo-gun, Cheongdo-do-do around December, 2013, bypassing the vehicle into the right way instead of removing the existing bridge, the Defendants had a duty of care to perform the construction work after installing the PErum gate, which is equipped with water to prevent the passage through the entrance of the removed bridge, and installing a light light or a guide to inform the risk of falling at night, and installing the traffic safety facilities (the sign, the traffic guidance map, the work marking) from 100 meters before the construction site to the point of time.

Nevertheless, the Defendants neglected to install safety fences or traffic safety facilities and did not verify whether they properly enter the installed light light or guide, etc., and proceed with the removal of a bridge, and the victim I (the age of 18) who driven the dives around 01:10 on December 8, 2013 was removed.

The river fells below 3m.

Accordingly, the Defendants jointly caused the death of the victim at the above site around 02:00 on December 8, 2013 due to the negligence in the above-mentioned business.

2. The defendant A, as a field manager in the E-mailed construction site where a road is excavated or excavated, shall report to the chief of the competent police station the date and time, construction section, construction period, construction method, and other necessary matters three days prior to the execution of construction works.

Nevertheless, the defendant is from March 27, 2013 to March 21, 2014.