(영문) 서울중앙지방법원 2015.04.27 2013가단325656
손해배상(기)
Text

1. Defendant C reconstruction and rearrangement project partnership each of the Plaintiffs’ KRW 22,199,812 and its related amount from September 6, 2013 to April 2015.

Reasons

1. Facts of recognition;

A. The plaintiffs are the 1/2 equity right holders of the 1st floor of the E-building located in Gangnam-gu Seoul and one parcel (hereinafter "the 1/1000 square meters of the 1st floor of the 1st floor of the 1st floor of the 1st floor of the 1st floor of the building (hereinafter "the 1st floor of the 2nd floor of the 1st floor of the 1st floor of the 1st floor of the 1st floor of the 2nd floor of the 2nd floor of the 2nd floor of the 2nd floor of the 2nd floor of the 2nd floor of the 2nd floor of the 1st floor of the 2nd floor of the 2nd floor of the 2nd floor of the 2nd floor of the 2nd floor of the 2nd floor of the 2nd building. The

B. The instant loan and the instant building are located in the Class-II general residential area, and the instant building was completed September 6, 2013.

C. The standard sunlight hours of the instant Dogra were 5 hours and 46 minutes in total during the eight hours from 8:00 to 16:00,000 during the eight hours from 9:00 to 15:00,000 during the eight hours from 8:00 to 16:00,000 during the eight hours from 8:00 to 16:0,000 during the eight hours from 8:00 to 9:0,000 during the eight hours from 8:0 to 15.0,000, the market price decline in the instant Dogra was 4,760,60 won as of September 17, 2013.

On the other hand, the instant building faces the instant lending at intervals of about 10 to 20 meters along the road. The previous building was also a second floor, which was installed with a glass, to the extent that it could infringe upon partial privacy. However, after the new construction, the 10th floor was the front glass, and the degree of invasion upon privacy was serious. Accordingly, the decline in the market price of the instant lending was 14,438,90 won as of September 17, 2013, when the construction is completed.

[Reasons for Recognition] Facts without dispute, Gap evidence 1-2, Gap evidence 9, 10, 11, Gap evidence 12-1, 2-2, Eul evidence 13-1 to 6, Eul evidence 1, and Eul evidence 4.