(영문) 울산지방법원 2017.02.08 2015가합22508
손해배상(기)
Text

1. The Defendant: 10,251,300 won to Plaintiff G; 10,399,000 won to Plaintiff H and Plaintiff I; 10,380,100 won to Plaintiff J; and the Plaintiff.

Reasons

Basic facts are the respective households of the Z (hereinafter referred to as “the Z”), which is an aggregate building in Ulsan-gu, Ulsan-gu, as shown in the attached Table 1 ownership list, and the remaining Plaintiffs except Plaintiffs D, E,O, Plaintiff P, Plaintiff R, and Plaintiff W are residing in each owned household.

The purport of the evidence No. 1 of A and the purport of the entire pleadings is as follows: at the time when the rest of the plaintiffs except the plaintiff D transferred the ownership of each of the households of the loan of this case, the building of light-framed structure kton roof ktony roof on the south-gu, Ulsan-gu, Seoul-gu, the south-gu, the south-gu, the above loan of this case was built, and the building of reinforced concrete structure mpib roof on the ground AB (see attached Table 2, e.g., relocation of new construction of new buildings). The defendant purchased each of the above land and completed the registration of ownership transfer on July 17, 2012, and newly built a new building on the ground (hereinafter referred to as the "building of this case").

No. 2 of the evidence No. 2 of this case. The building of this case is an automobile-related facility building, underground and ground 7th floor located in a quasi-residential area. The highest height is about 39.4m, and the straight line distance with the loan of this case is about 4.1m.

The Defendant obtained approval for the use of the instant building on June 12, 2015

The result of the appraiser A evidence 3, Eul evidence 2-2, evidence 1, 2-3, and appraiser AC’s appraisal of each of the instant sub-construction of the building of this case. In each of the instant sub-households prior to the construction of the building of this case, the hours for each of the hours indicated in the attached Table 4 “total sunshine hours prior to the construction” between 8:00 and 16:00, and the attached Table 4 between 9:00 and 15, the hours for each of the consecutive sunshine hours prior to the construction of the building of this case. After the construction of the building of this case, the hours for each of the hours indicated in the attached Table 4 “total sunlight hours after construction” between 8:00 and 16:00, and between 9:0 and 15:00.