(영문) 서울중앙지방법원 2013.07.10 2012나2230
구상금
Text

1. All appeals filed by the Plaintiff and the Defendants are dismissed.

2. The costs of appeal shall be borne by each party.

purport, purport, and.

Reasons

1. Basic facts

A. Defendant A operated a manufacturers of synthetic rubber Products with the trade name “C” in the building of the general steel structure 7 Dong-gu, Daegu-gu, B B, 7-dong General Steel Structure Gallllll, Inc. (hereinafter “instant building”). Defendant Samsung Fire Marine Insurance Co., Ltd. (hereinafter “Defendant Samsung Fire”) set the insurance period between December 15, 2009 and December 15, 2010 between the Defendant Samsung Fire Marine Insurance Co., Ltd. (hereinafter “Defendant Samsung Fire”) and the Defendant Samsung Fire Co., Ltd. entered into a fire insurance contract with the effect that Defendant Samsung Fire will be liable for damages to a third party within the insurance coverage amount of KRW 300 million if Defendant Samsung Fire would be liable for damages due to the actualization occurred from the instant building.

B. On both sides of the instant building, there are buildings of the general steel structure of No. 6 East general steel structure, sand position panel, roof factory (hereinafter “D building”) in which E operates gold processing business under the trade name of “F” (hereinafter “F”) and the 8 East general steel structure, sand position plate, cell site factory (hereinafter “F building”), and the Plaintiff concluded a fire insurance contract with E and G with each of the following contents.

From June 13, 201 to June 13, 2011, from June 25, 2010, to June 25, 2011, the insurance policy holder and the insured insured shall cover KRW 148,000,00 in total of the total cost of KRW 5,000,000, 13,000, 72,450,000 buildings (one straw) 13,000,000 buildings (one straw) 13,00,000 buildings (one straw) in which the objects of insurance are located, and the amount of insurance coverage is KRW 80,00,00,00 in total, total cost of KRW 80,00.

C. However, around 00:45 on July 6, 2010, the instant building was destroyed by fire, and as a result, D and F were destroyed by some parts of D and F buildings, and machinery, etc. located in D and machinery, appliances, straws, and F were destroyed by fire.

(hereinafter “instant fire”). D.

The plaintiff is based on the result of the damage evaluation of the damage adjuster.