Text
1. Defendant A’s KRW 5,293,812 as well as the Plaintiff’s 5% per annum from August 8, 2015 to October 24, 2017, and October 25, 2017.
Reasons
1. Basic facts
A. (1) The occurrence of a fire occurred. Defendant A leased 205,305, and 305 of the 5th floor above the 5th floor above the 1st floor above the 5th floor above the 1st floor above the Goyang-dong, Manyang-si, and operated the D “D”. On December 14, 2014, fire occurred in the 22:31st floor bend, the 2nd floor, the 301-304, the 401-406 floor below the 301-304, and the 401-406 floor below the 2nd floor plan.
D FDD E
B. The relevant Plaintiff is an insurer that entered into a fire insurance contract with the Plaintiff holding C Building 301, 402, and 403, with the Plaintiff holding H, 401, and 404-406, possessing Nos. 302-305, and with the Plaintiff seeking to compensate for damages to the building.
The defendant interesting State Fire & Marine Insurance Co., Ltd. is an insurer who has entered into a fire liability insurance and business liability insurance contract with the defendant A.
(c) As a result of the investigation into the cause of a fire, the results of the investigation conducted by the Gyeonggi Provincial Police Agency, the Japanese fire fighting team, and the Korea Electrical Safety Corporation shall be as follows:
① It is determined that the two stories of D burials were first launched on the roof of a material warehouse rather than on the ceiling of the resting room. ② However, it is difficult to determine the specific location and distance of the pre-explosion points because the location and distance of the installation of the combined space (such as electric wires discovered from the resting room floor, and on the other electric wires, materials storages), which show the trace of the combined line, is difficult. ③ In light of the oral content and the fact that the outside person’s access to the warehouse was not easy, the possibility of artificial circumstances is low, and it is determined that the exhaustive clothes were damaged due to the electrical heat of electric wires. (1) In light of the foregoing, the Gyeonggi Provincial Police Agency No. 2 audience Scientific Investigation Team No. 2) the mountain fire fighting area ① the mountain fire fighting area was removed on the front of arrival at the site.