Text
1. Defendant B’s representative council shall be the Plaintiff:
(a) The attached drawings of each real estate listed in the annexed real estate list shall be indicated;
Reasons
1. Basic facts
A. On June 26, 1998, the Plaintiff was divided into 12,489 square meters of D Forest in Gangseo-gu Seoul Metropolitan Government ( April 18, 2014), Gangseo-gu, Seoul, as well as C Forest.
(E) The forest land and E 842 square meters of forest land (hereinafter collectively referred to as “instant forest land”).
(2) The Defendant Hyundai Industrial Development Co., Ltd. (hereinafter “Defendant Hyundai Industrial Development”) newly built an I apartment house (hereinafter “instant apartment site”) on the ground of HW large 86,045 square meters in Seoul Gangseo-gu, Seoul, including the above F, from June 201 to May 2005, with the aim of rebuilding G apartment on the instant forest land located in Gangseo-gu Seoul, Gangseo-gu, Seoul, for the purpose of rebuilding, etc., G apartment reconstruction housing association (hereinafter “instant reconstruction association”). The instant apartment was approved for use by the head of Gangseo-gu Seoul on May 31, 2005.
3) Defendant B’s council of occupants’ representatives (hereinafter “Defendant’s council”)
B) The instant forest land is a management body consisting of occupants of the instant apartment. (B) The instant forest is part of the Dobongsan as a neighboring park area. The boundary point between the instant apartment site and the instant apartment site is higher than the instant apartment site, and it is a sloping of the slope of the sloping slope.
2) While constructing the instant apartment, Defendant Hyundai Industrial Development installed a retaining wall structure between the instant forest and the site of the apartment. The retaining wall structure is located near the line connected each point of the 2,24, 3, 4, 5, 6, and 55 in the order of priority indicated in the attached drawings. The retaining wall structure is located in the retaining wall structure, which connects each point of the 52, 53, 22, 54, 55, and 52 of the instant forest among the instant forest and land, in sequenced with each point of 52, 53, 22, 54, 55, and 52.
The results are followed.
Modern Industrial Development also connects each point of 56 to 86, 56 of the same drawings.