logobeta
본 영문본은 리걸엔진의 AI 번역 엔진으로 번역되었습니다. 수정이 필요한 부분이 있는 경우 피드백 부탁드립니다.
텍스트 조절
arrow
arrow
(영문) 수원지방법원평택지원 2015.07.02 2014가단44869
손해배상
Text

1. The Defendant’s KRW 7,606,403 as well as 5% per annum from August 21, 2014 to July 2, 2015 to the Plaintiff.

Reasons

1. Facts of recognition;

A. 1) The Plaintiff is the party, etc.

2) The Defendant is a corporation that manages and operates Pyeongtaek-si container wharf (du number 6-9) in Pyeongtaek-si, which is located on the full side of Pyeongtaek-si. The Defendant is a corporation that manages and operates Pyeongtaek-si Port and the container wharf (du number 6-9).

B. At around 13:50 on August 21, 2014, the Plaintiff: (a) loaded 40TEU container to the instant cargo; and (b) arrived at the Pyeongtaek Port around 14:40 on the same day; (c) the Plaintiff intended to move the container to the loading and unloading place designated as the loading and unloading place; and (d) within 2A-24 on the 2A-24 zone, the Plaintiff was installed in the Twit-ro container open (TWer CY) container open or installed in the order of arrival of the first vehicle in the order of arrival of the vehicle.

In the loading and unloading work, the plaintiff also stopped in 2A-17 areas in accordance with the arrival order.

3) As above, while the Plaintiff is waiting for the order of loading and unloading operations, the rubber type clicker Crafe, which is driven by the Defendant Company’s non-persons affiliated with the Defendant Company, who completed loading and unloading operations within 2A-12 hours before the Plaintiff waits for the order of loading and unloading operations.

b)an accident involving the rear part of the driver's seat of the instant cargo vehicle being waiting for loading and unloading in 2A-17 areas while being moved to the following loading and unloading operations (hereinafter referred to as the "accident of this case").

(C) After the instant accident, the Plaintiff requested repair of the instant cargo immediately after the instant accident, and the repair was completed around September 15, 2014, and KRW 12,375,000.

arrow