logobeta
본 영문본은 리걸엔진의 AI 번역 엔진으로 번역되었습니다. 수정이 필요한 부분이 있는 경우 피드백 부탁드립니다.
텍스트 조절
arrow
arrow
(영문) 부산지방법원 2015.10.08 2014가단208497
구상금
Text

1. The plaintiff's claim is dismissed.

2. The costs of lawsuit shall be borne by the Plaintiff.

Reasons

1. Basic facts

A. The Plaintiff related to the Plaintiff entered into an automobile comprehensive insurance contract with A to cover the insurance period from September 22, 2009 to September 22, 2010 with respect to the B EF Laol car owned by A (hereinafter “instant vehicle”). The Defendant is a local government that installs and manages signal, etc. at the Busan Simban-dong Intersection (hereinafter “instant intersection”) near the instant accident site, as seen below.

B. (1) On September 14, 2010, C driving the above vehicle at around 23:50, in accordance with the U.S. and U.S. left-hand turn-hand turn-hand turn-on signal on the road at the intersection of this case at the intersection of this case. On the other hand, C conflicts with the left-hand side of D Driving E. O. E. O.b. (hereinafter “the instant O.E. E. E. E. E. E. E. E. E. E. E. E. E. E. E. E. E. E. E. E., E. E. E. E., E. E.

(2) A driver of Oral Baba has suffered injury, such as the left-hand pelpel, pelvis, etc. due to the above accident.

C. A system of road and signal signal lights (1) of the instant accident intersection is installed at the 24.5m from the intersection of the territorial road to the intersection, and the length of the internship section is 16.6m in the intersection and 41m in the intersection.

(2) At the time of the instant traffic accident, the signal operation status of the instant road to crosssections from the Uton section at the time of the instant traffic accident was ① green signal between 61 seconds from the south East East East East East East East East East East East East East East East East East East East East East East East East East East East East East East East East East East East East East East East East East East East East East East East East East East East East East East East East East East East East East East East East East East East East East East East East East East East East East East East East East East East East East East East East East East East East East East East East East East East union signal from the water surface to the water surface of the water surface and the green signal between 33 seconds East East East East East East East East East East East East East East East East East East East East East East East East East East East East East East East East East East East East East East East East East East East East East East East North North North North North

arrow