logobeta
본 영문본은 리걸엔진의 AI 번역 엔진으로 번역되었습니다. 수정이 필요한 부분이 있는 경우 피드백 부탁드립니다.
텍스트 조절
arrow
arrow
(영문) 서울동부지방법원 2016.12.09 2015가단38492
추심금
Text

1. The plaintiff's claim is dismissed.

2. The costs of lawsuit shall be borne by the Plaintiff.

Reasons

Basic Facts

EEX Construction Co., Ltd. (hereinafter referred to as “Do Young Construction”), on December 13, 2012, between Do Young Construction Co., Ltd. (hereinafter referred to as “Do Young Construction”), entered into a subcontract agreement with 6.77,870,483 won of reinforced concrete construction (one construction section) among the new construction works of Changwon-si, STX KN 13BL (BL) implemented at Changwon-si 384-2, 13, 2012, 3.5 billion won of reinforced concrete construction (3.5 billion won of 4.5 billion won of 5 billion won of Do Changwon-si, which was implemented at 384-2, 2013, 3.5 billion won of 4.5 billion won of Do New Construction (3.5 billion won of 5 billion won of Do Changbuk-do 2, 384-4,500 billion won of Do Chang-do 13.5 billion won of 5 billion won of Do New Construction (3.4.4.5 billion won of Do 2

(도영건설이 에스티엑스건설 주식회사로부터 하도급받아 위 무등리 384-2 일원에서 시행한 13BL 및 25BL 철근콘크리트공사를 ’창원공사‘라고만 한다). 에스티엑스건설 주식회사는 2013. 7. 4. 도영건설과 사이에, 에스티엑스건설 주식회사가 도영건설에게 화성시 팔탄면 을암리 154-2 일원에서 시행되는 로얄앤컴퍼니 화성공장 신축공사 중 철근콘크리트 공사를, 105억 3,800만 원에 하도급주는 내용의 하도급계약을 체결하였고, 이에 따라 도영건설은 위 화성시 현장에 철근콘크리트공사를 진행하였다.

원고는 2013. 7. 16. 도영건설과 사이에, 원고가 도영건설에게 도영건설이 시행하는 로얄앤컴퍼니 화성공장 신축공사 현장에 원고의 가설자재를 임대하기로 하는...

arrow