(영문) 서울중앙지방법원 2014.08.21 2013가단273069
구상금
Text

1. The plaintiff's claims against the defendants are all dismissed.

2. Litigation costs shall be borne by the plaintiff.

Reasons

1. The following facts of the facts do not conflict between the parties, or can be acknowledged in full view of the purport of the entire pleadings as stated in the evidence Nos. 1, 2, 2, 4, 5, 6, 8, 7-8, and 1, and 1.

On February 25, 2009, the Plaintiff entered into a contract with the Korea Electric Power Corporation (hereinafter referred to as the “A”), with respect to the electrical construction implemented by A under a contract from the Korea Electric Power Corporation, the insured and the contractor, the insurance period from February 25, 2009 to February 25, 2010, the maximum compensation amount is KRW 24:00 per person, the maximum compensation amount is KRW 200 million per person and KRW 200 million per accident, and the insured’s employees are liable to compensate for damages arising from the insured’s occupational accident exceeding the compensation amount under the relevant Acts and subordinate statutes, such as the Industrial Accident Compensation Insurance Act (hereinafter referred to as the “instant insurance contract”).

B. The Defendant Trucking Co., Ltd. (hereinafter “Defendant Co., Ltd.”) is the owner of B Car Bara Bara (hereinafter “the instant Bara”) and the Defendant Korea Freight Trucking Association (hereinafter “Defendant Federation”) concluded a mutual aid agreement with the Defendant Co., Ltd. with the content that the Defendant Co., Ltd. will compensate for losses caused by the Defendant Co., Ltd.’s legal liability due to an accident arising from the operation of the instant Bara (hereinafter “instant mutual aid agreement”).

C. A was awarded a contract with the Korea Electric Power Corporation for the construction of electric facilities of the size of 4,250kW (new stocks) to the Korea Electric Power Corporation (hereinafter “instant electrical construction”), prior to the Cheongju-dong, Cheongju-dong Office’s Cheongju-dong Office’s Cheongju-dong Office’s Cheongju-dong Office’s Cheongju-dong Office’s Cheongju-dong Office’s Had’

A shall be affiliated C.