Text
1. The plaintiff's claim is dismissed.
2. The costs of lawsuit shall be borne by the Plaintiff.
Reasons
1. Basic facts
A. The Plaintiff is a mutual aid business operator who has entered into a bus mutual aid agreement with a bus operated by a flexible transport (hereinafter “instant bus”). The Defendant is a construction business operator who carries out the road packaging work prior to the drained Sea-gun, Namnam-gun (hereinafter “instant construction work”).
B. The Defendant, while carrying out the instant construction, set up a brightness plastic brightness with sand in order to distinguish between the road on which vehicles can proceed and the construction section, and obstructed the passing vehicle from the road to the construction section.
C. On October 31, 2013, when the instant construction was in progress, around 06:29, 06:0, the Hannam-gun, Namnam-gun, where the instant construction was in progress, the number-free vehicle, straw-man vehicle, 1 ton vehicle, and the instant bus were going in order from the front side of the water level to the front side of the water level, from the front side of the water level. However, on the number-free vehicle, the vehicle was driving along the front side of the plastic line by reporting that the front side of the plastic line is far away from the front side of the water level, and the vehicle stopped the front line by reporting that the front side of the vehicle, which was followed by the latter, will slowly pass along the front line, also stop the vehicle of one ton.
The bus of this case was shocked by the front part of the bus of this case without confirming the suspension of one ton truck. The bus of this case shocked the rear part of the bus of this case, one ton truck, and the rear part of the last vehicle of the bus of this case.
(hereinafter referred to as “instant accident”] (hereinafter referred to as “instant accident”): (In the absence of dispute, each entry and image of evidence A1 through 8 (including each number), the result of the instant bus screening CD verification, the purport of the entire pleadings)
2. The plaintiff's assertion
A. The defendant does the construction of this case.