Text
1. Defendant C:
A. Of 22, 23, 24, 25, 26, 27, and 22 of the annexed drawings among 22, 23, 24, 25, 26, 27, and 22.
Reasons
1. Facts of recognition;
A. On January 16, 2015, the Plaintiff purchased approximately 2671 square meters (hereinafter “instant land”) from Leecheon-si, a foundation E, and completed the registration of ownership transfer with respect to the instant land on the grounds of such purchase.
B. The Defendant C, prior to the Plaintiff’s acquisition of ownership, owns and uses, in fact, a toilet constructed on the ground of Section 175 square meters in the annexed drawing “A” portion among the instant land (hereinafter referred to as “A”) among the instant land; an assembly-type warehouse constructed on the ground of Section 41 square meters in the same drawing indication “B” part (hereinafter referred to as “B” in this case); a warehouse installed on the same drawing indication on the ground of 11 square meters in the same drawing indication; and a toilet installed on the ground of Section 11 square meters in the same drawing indication “C” portion (hereinafter referred to as “CC portion”); and a toilet installed on the ground of Section 4 square meters in the same drawing indication “D” portion (hereinafter
(hereinafter referred to as the "First Building of this case").
Defendant B, prior to the Plaintiff’s acquisition of ownership, owns and uses a warehouse built on the ground of 15 square meters in the area of “five square meters” as indicated in the attached drawing among the land in the instant case (hereinafter “five parts”), a house constructed on the ground of 46 square meters in the area of “6 square meters” indicated in the same drawings (hereinafter “the part of66 area”), a prefabricated-type warehouse built on the ground of 27 square meters in the same drawings (hereinafter “other7 square meters”), and a warehouse marked on the same drawings (hereinafter “area in relation to7”), and a warehouse marked on the same drawings, which is located on the area of 10 square meters (hereinafter “the area of 88 square meters”).
(hereinafter referred to as “instant building 2”) d.
Of the instant land, the sum of rent for the lease deposit for the portion 1,394,00 won from June 1, 2015 to October 31, 2019 with respect to the portion 1,200, 200, 397,000 won for the portion 1,39 to October 31, 2019 regarding the portion 20, 300 won for each of the instant land.
(e) The portion on “vout”, “viiy”, and “8” portion on the land in this case.