Text
1. Defendant B and C: (a) KRW 85,792,225 for each Plaintiff; and (b) KRW 5% per annum from July 1, 2014 to December 11, 2014 for each Plaintiff.
Reasons
1. Basic facts
A. Progress 1: G, H, I, and J (hereinafter “G, etc.”)
on March 23, 2002, the Note General Construction Co., Ltd. (hereinafter referred to as “the Note Special Construction Co., Ltd.”)
B) As between G and the 18-household 18 household (hereinafter “instant loan”) with the size of 1st underground and 6th ground by procuring construction costs on the land surface outside Seocho-gu Seoul Metropolitan Government K and 3 parcels owned by G, etc.
2) On September 30, 2002, G, etc. entered into a construction contract with the purport of newly constructing the instant loan. After the said construction work, G, etc. divided into seven households of the instant loan, and 11 households of the instant loan, including the real estate listed in the separate sheet (hereinafter “instant building”). G, etc. agreed to complete the registration of ownership transfer for the said 11 household to a person designated by the instant loan, at the same time as the completion of the instant loan loan.
3) Main paper Co., Ltd. on October 16, 2002 (hereinafter referred to as the “Song-dozk”) shall be Song-dok Co., Ltd. (hereinafter referred to as the “Song-dok”)
(4) Of the instant loan construction, the instant loan construction was subcontracted to the Plaintiff at KRW 2,050,000 for the cost of interior interior interior interior interior interior interior interior interior interior interior interior interior interior interior interior interior interior interior interior interior interior interior interior interior installation. The construction of the instant loan was completed on or around May 15, 2003. The construction of the instant loan was completed on or around June 2003. G et al. completed the registration of ownership transfer on or around September 24, 2003 as to the instant seven households, including G et al., the instant loan construction; and on the instant 11 household, G et al., the ownership transfer registration was completed on or after the death of the J on January 24, 2004, each of which was completed on or around June 14, 2004 each inheritance share due to inheritance under the name of the JJ.
(hereinafter referred to as “G, etc.”) after the death of J, including G, H, I and L.
1) In the event that the principal case does not pay the above construction cost to the consignor, it shall not be paid to the consignor, and the 14 households, including the building of this case, from among the loan of this case (101, No. 101.