Text
1. The Defendant’s KRW 82,552,048 for the Plaintiff and KRW 6% per annum from February 23, 2013 to December 24, 2015.
Reasons
1. Facts of recognition;
A. The contract of this case between the plaintiff and the defendant 1) Hanjin Heavy Industries Co., Ltd. (hereinafter " Hanjin Heavy Industries").
on February 26, 2012, the Defendant is entitled to the construction work of the machinery or equipment which puts or disembarks hot objects into chain (hereinafter referred to as “instant construction work”).
(i) KRW 940,00,000 (in the absence of a separate indication of value-added tax; hereinafter the same shall apply);
(2) On July 31, 2012, the Defendant awarded a subcontract to the Plaintiff for the production and installation of three Badridle (80/16 tons of Obride, 71/16 tons of Obride, 10/3 tons of Obride, 10/3 tons of Obride) during the instant construction work, and for the installation of two Madle-day, Mab block one, 100,000 construction cost, which the Defendant provided to the Plaintiff.
hereinafter referred to as the "instant contract"
(b) Order sheet;
1. Construction name: The construction site of this case, the manufacture, installation, and outsourcing of the Austria;
2. The name/specification/Quantities: 80/16, 71/16, 10/3 Mono: 10,3 Tron: Six .
3. Construction SCOE 1): Expenses for transportation, equipment, etc. of materials (e.g., electricity, machinery, shipbin), manufacturing, supply, installation 2) factory inspection, completion inspection, and 3) Manobane 4) in case of installation, completion inspection, 4) in case of transport, equipment;
4. We supply range 1) OHC 2) POHC: 3, the Astststru/Marail Day, materials, and production 3) wait, transportation costs, separate settlement method: 390,000,00 VAT separate settlement method: 30% of the down payment / 40% after delivery / supply 30% of the supply schedule: Hanjin Industries supply place between July 25, 2012 and November 30, 2012: The main contents of the instant contract are as follows: 3) at the time of the instant contract, the Plaintiff and the Defendant manufacture three OBke, in accordance with the design drawings provided by the Plaintiff at the Plaintiff’s factory; the Defendant conducts quality inspection at the Plaintiff’s factory; and the Plaintiff installs three OBke, the Plaintiff’s construction site at the instant construction site after quality inspection.