(영문) 서울고등법원 2015.06.12 2014나18263
손해배상(기)
Text

1. The judgment of the first instance court is modified following the Plaintiff’s amendment of the claim at the trial. A.

Defendant B.

Reasons

Basic Facts

On December 16, 2002, Defendant B built a building and a bridged building with permission for construction of 464.40 square meters of facilities such as animal and plant-related facilities (hereinafter referred to as 'Dong building' among the forests below 'Dong building'; hereinafter referred to as 'Dong building' among the forests below) on the ground of Namyang-si, Namyang-si (hereinafter referred to as 'the land in this case') and 464.40 square meters of facilities such as 295 square meters (hereinafter referred to as 'Dongdong building' among the forests below) and used from August 21, 2003.

On September 206, 2006, Defendant B constructed a building of 286 square meters of the Gyeonggll Building (hereinafter referred to as “the building of this case among the forests,” hereinafter referred to as “the building of this case”) without permission on the land of this case and H on the ground of Namyang-si, Namyang-si, and extended the building of 51.6 square meters of storage on the lower side of the building of this case on May 2007.

(아래 그림 중 [창고] 기재 부분). 나동 건물과 이 사건 건물이 위와 같이 건축 및 증축됨으로써 이 사건 토지 지상에는 나동 건물과 이 사건 건물이 사람 1명이 통행할 수 있을 정도의 거리를 두고 존재하게 되었는데, 위 두 건물의 마주 보는 각 외벽(아래 그림 중 ◁ 표시 안쪽)에 각 건물의 분전반(이하 이 사건 건물 외벽에 설치된 분전반을 ‘이 사건 분전반’이라 하고, 양 분전반을 ‘이 사건 분전반들’이라 한다)이 설치되었다.

Defendant B leased the instant building to Defendant A, and Defendant A operated the manufacturing factory of handbags in the name of “I” in the instant building.

In addition, on November 2, 2009, Defendant B leased 165 square meters of the middle part of the building B to the Plaintiff, and the Plaintiff used the middle part of the building as the warehouse of the books produced by the Plaintiff.

(hereinafter “instant lease agreement” and “the warehouse of this case”) around 16:46 October 25, 2010, the building and the building of this case were destroyed by fire near the squad of this case.

(hereinafter “instant fire.” On April 9, 2013, the Plaintiff was the instant squad and the instant fire.