1. The Defendant (Counterclaim Plaintiff) paid KRW 25,439,000 to the Plaintiff (Counterclaim Defendant) and its payment from January 14, 2014 to January 28, 2014.
Reasons
A. A person operating a private company. Around December 201, Nonparty E-S Cable Co., Ltd., which is the props of the land set forth in S-S-gu, Seocho-gu, Seocheon-gu, Seocheon-gu, S-gu, S-S-S-S-S-S-S-S-S-S-S-S-S-S-S-S-S-S-S-S-S-S-S-S-S-S-S-S-S-S-S-S-S-S-S-S-S-S-S-S-S-S-S-S-S-S-S-S-S-S-S-S
From the above D and nine parcels above, the construction work for building the factory site in the H complex (hereinafter the above factory site is referred to as the “instant factory site,” and the above construction work was contracted for.
On February 1, 2012, the Plaintiff entered into a contract for construction works (hereinafter “instant contract”) with the Defendant, setting the contract amount of KRW 600 million and the construction period from February 1, 2012 to May 30, 2012. The main contents of the instant contract and special agreement are as follows.
- - [Standard Contracts for Private Construction Works]
1. Contract amount: Value of supply: KRW 600 million per day* Value-added tax and April insurance shall be dealt with by the plaintiff;
5. Contract deposit: 50 million won intermediate payment: Any balance at the time of bank settlement: A corresponding thereto for the progress of the construction project.
6. Construction work execution section: Drawings. Construction costs other than detailed quantities shall be adjusted later;
A contractor (Defendant) and a contractor (Plaintiff) shall enter into a construction contract in accordance with this Agreement and the terms and conditions of the construction contract and the attached design drawings and specifications, and shall prepare two copies of this Agreement and related documents as evidence and keep them in one copy.
[Matters of Special Agreement]
1. The criteria and specifications for construction shall be based on the revised plan plan plan plan Meetical plan Meet, but the detailed execution details by location shall be based on the approved design drawings of theR company;
2. The total area of the site, including H =1.5-1.2m) works;
3. It shall be subject to the condition that groundwater is permitted as one construction and household water;
4. A water tank (as approximately 20-25t) installation and water pipes, and a tank shall be attached to the Defendant.
5. Landscape planting in the site of each enterprise shall be excluded;
6. The conditions for the completion of civil engineering works on the responsibility of the contractor shall not be interrupted.