Text
1. The Defendants, from the Plaintiff, set forth in attached Table 3 Schedule 4, are as follows: (5) of each land indicated in the “land” column.
Reasons
1. Facts of recognition;
A. The land in this case is changed 1) The address of the land in Dongdaemun-gu Seoul, Dongdaemun-gu, Seoul (hereinafter referred to as the “land”) No. A,846 square meters (hereinafter referred to as all the land in the same Dong shall be omitted and specified by attaching a “number” after the lot number.
(1) On January 19, 1939, the land readjustment project is promoted, which is included in the land readjustment project district in the C district as a public notice of the land readjustment project in the C district, as of January 19, 1939.
(3) After the piracy, the Defendants’ Intervenor (hereinafter “Korea”)
2) On August 14, 1962, the former A (4,846 square meters) was divided into the former A (3,275.5 square meters), D (287.5 square meters), and E (1,283 square meters) as a co-owned property partition on August 23, 1954. On August 15, 1961, the former A and D were combined with the former (3,563 square meters). Here, F (94 square meters) and G (538 square meters) were divided into two,03 square meters.
3) On February 13, 1968, the land above 4 pieces of land was reduced as follows and substituted by a disposition of land substitution by a land substitution and rearrangement project on February 13, 1968.
1.(a)
Land described in the subsection), I (192.4p., 2 Schedule)
1.(b)
Land set forth in the subsection, J (278.5, 2 Schedule 2)
1.(c)
on August 31, 1984, dividing L into the land described in paragraph (1) and the old KK (214.5 square meters, August 31, 1984, Schedule 2 attached hereto.
1. D.
land described in subsection (1)
[Attachment 2] M, M (397.4 square, 2]
2.(a)
(2) F (94 square meters): Gu N (329.3 square meters, August 31, 1984, 1984) and attached list 2
1. (e);
land described in subsection (1)
(3) G (538 square meters) : Q (3.9 square meters, 2.196 square meters, 2.2.
2.(c)
Land set forth in the subsection, R (282p, 2 Schedule)
2. D.
(1) The land indicated in Section 1 and Section 2 of this case is the land listed in Section 1 and Section 2 of this case. The land listed in Section 1 of Annex 2 is the land listed in Section 1 and Section 2 of this case. The land listed in Section 2 of this case is the land listed in Section 2 of this case.
4) E (1,283 square meters): S (284.6 square meters), T (480.4 square meters) totaling 2 parcels, 1944.