logobeta
본 영문본은 리걸엔진의 AI 번역 엔진으로 번역되었습니다. 수정이 필요한 부분이 있는 경우 피드백 부탁드립니다.
텍스트 조절
arrow
arrow
(영문) 대전지방법원 천안지원 2015.11.10 2015고단789
사기
Text

A defendant shall be punished by imprisonment for two years.

Reasons

Punishment of the crime

around May 13, 2013, the Defendant prepared a contract document with the victim D, and the victim E, respectively, to complete the construction of a house at the office of the Hodong-dong Samsung Fire D Co., Ltd. located in Seo-gu, Seocheon-gu, Seocheon-gu, Seocheon-si, Seocheon-gu, and on August 20, 2013. The total construction cost shall be KRW 183 million, and the construction cost shall be paid at the H office located in the same Gu G, and on May 19, 2013, the victim I prepared a contract document with the victim I, “No later than August 20, 2013, the total construction cost shall be KRW 100,000,000,000,000,000,000,000,000 won, and the contract price shall be completed at the end of August 20, 2013.”

However, the facts did not notify J that the said new house construction work will be completed by subcontracting the said new house construction work. From October 2012, the civil petition was filed while performing the civil construction work for the construction work for the site for the electric house in the Gangnam-gu Seoul Special Metropolitan City, Chungcheongnam-gu, Seoul Special Metropolitan City, and the project was failed to comply with the order of restoration from the Gangnam-gu Office to the original state, and there was a loss equivalent to 200 million won. In the above F, not only the victims and L house new construction work but also the victims and L house new construction work for the electric house in the same Gu M in the same Gu as the victims and L house new construction work for the electric house in the same Gu, the new house construction work for the N, the new house construction work for the electric house in the same Gu, and the new construction work from the victims, even if the construction work price is paid from the victims, there was no intention or ability to perform the construction work as stipulated in the terms of the contract.

The Defendant, from May 13, 2013 to January 6, 2014, set forth in attached Table 1, the sum of KRW 99,100,000 as shown in attached Table 1, and from May 14, 2013 to July 12, 2013 from the victim E.

arrow