(영문) 서울중앙지방법원 2019.05.21 2018가단5111796
구상금
Text

1. The Defendant’s KRW 169,653,311 among the Plaintiff and KRW 15,00,000 among the Plaintiff, shall be KRW 38,591,442 from December 21, 2017.

Reasons

1. Facts of recognition;

A. The current status of ownership and use of the instant building and the damaged building 1) The instant building and the building on land D, E, F and ground (hereinafter “instant building”).

) The Plaintiff’s Intervenor is owned by the Plaintiff’s Intervenor and is G land and ground buildings (hereinafter “instant neighboring buildings”).

(2) The Plaintiff’s Intervenor and H leased each of the above buildings from the Plaintiff’s Intervenor and H used them as a warehouse, etc., and engaged in household wholesale business. (2) The Plaintiff’s ground-based building I (hereinafter “the instant first damage building”) located adjacent to the instant building is owned by Nonparty J, and K operated a metal processing factory under the name of L with some of the above buildings leased a size of 181.5 square meters.

3) The ground buildings located in M (hereinafter “the second damage building of this case”) adjacent to the building of this case in terms of eternity.

(1) The non-party N owns the non-party N, and the non-party corporation O (hereinafter referred to as “non-party corporation”).

(B) On November 19, 2017, the instant building leased by the Defendant was used as a manufacturing factory of optical communication equipment. (B) On November 19, 2017, a fire occurred in the part where the building was used as a temporary building by connecting the roof between the warehouse and the warehouse among the instant building that was used by the Defendant, and the instant building was destroyed by fire on the first damaged building located adjacent to the instant building and the second damaged building, and the fire occurred in part of each of the instant damaged buildings and the machinery, equipment, etc. inside the said respective damaged buildings, which were destroyed by fire.

(2) As a result, the CCTV installed at the entrance of the building of this case was found as a result of the on-site investigation, and as a result, there were several fire-related factors, such as the point of combustion, oil promotion agents, etc.