logobeta
본 영문본은 리걸엔진의 AI 번역 엔진으로 번역되었습니다. 수정이 필요한 부분이 있는 경우 피드백 부탁드립니다.
텍스트 조절
arrow
arrow
(영문) 서울고등법원 2016.07.08 2015누41144
시정명령등취소
Text

The Defendant’s order to pay penalty surcharges in attached Form 2(2) against the Plaintiff on April 1, 2015 shall be revoked.

The plaintiff.

Reasons

1. Facts that there is no dispute over the details of the disposition (based on the recognition of the disposition), Gap (including a serial number; hereinafter the same shall apply), three, six,9,15, 21, and the purport of the whole pleadings;

A. The status and status of the Plaintiff, etc., the Plaintiff, KS Construction Co., Ltd., and Hyundai Construction Co., Ltd. (hereinafter referred to as “Co., Ltd.,” are omitted, and three companies, including the Plaintiff, etc., including the said three construction companies, are “business entities” as prescribed by Article 2 subparag. 1 of the Monopoly Regulation and Fair Trade Act (hereinafter “Fair Trade Act”).

Plaintiff

The general status of the three buildings shall be as follows:

(1) 1. 2. 2. 1. 4. 2. 4. 2. 7. 1. 1. 2. 2. 4. 7. 1. 7. 2. 13. 8, 13, 417, 075 . 1. 4. 1. 5 . 1. 2. 2. 2. 2012,078, 113. 8. 365, 269 . 3. 159, 398 6. 6,115 2. 2. 3. 46 . 3. 46. 1. 46. 2. 364, 13. 364, 2. 361, 863 364, 757, 757 5. 205 2. 7. 48. 36. 1946. 7. 36. 1.

B. (1) On February 1, 2010, the Korea Water Resources Corporation, the main point of which is the ordering construction of the construction works for the Bocheon Multipurpose Dam, published the construction works for the Bocheon Multipurpose Dam (hereinafter “instant construction works”) with the aim of stably coping with the anticipated water shortage in the Geum River basin, and reducing flood damage in the Geum River basin where floods frequently occur, through competitive bidding, the construction works for the Bocheon Multipurpose Dam (hereinafter “instant construction works”).

The expected construction amount is KRW 165,291,00,000 (including value-added tax) and the expected construction period is 1,610 days from the commencement date.

(2) Tender method (A) tender of the instant construction is below.

arrow