(영문) 대구지방법원 2015.03.18 2014나302346
구상금
Text

1. The defendant's appeal is dismissed.

2. The costs of appeal shall be borne by the Defendant.

Purport of claim and appeal

1..

Reasons

1. Basic facts

A. The Plaintiff is the party 1) The Plaintiff’s vehicle A and B (hereinafter “instant truck”).

A) A company that entered into an automobile comprehensive insurance contract with respect to the company. (2) The Defendant is a company that entered into an order for repair facilities renovation and repair works (hereinafter “instant construction works”) in the vicinity of the road (67th road; hereinafter “instant road”) through which the Gyeongbuk-do management road from the Korea Rural Community Corporation passes through the Gyeongbuk-do major road in the Gyeongbuk-do.

3) New concrete Co., Ltd. (hereinafter “new concrete”)

(B) The company that entered into a contract with the elderly branch office of the Korea Rural Community Corporation for material supply, such as drainage pipes, necessary for the instant construction. The occurrence of the instant accident, around 09:10 on May 7, 2008, C driving the instant truck and proceed directly from the front section of the instant road to the front section of the valley, while driving the instant truck to the front section of the instant road to the front section of the instant road, and driving the instant bicycle to the front section of the instant truck (the right side of the instant truck’s running direction) going to the front section of the instant road (hereinafter referred to as “the instant bicycle”).

) A person suffered injury (hereinafter referred to as “instant accident”) such as the closed d’s bones bed of head and bones (hereinafter referred to as “the instant accident”);

Attached Form

c. At the time of the occurrence of the instant accident, the current situation 1) At the time of the occurrence of the instant accident, the new concrete stopped three vehicles, such as truck and tea, to be used at the construction site of the instant case (hereinafter referred to as “instant work vehicle”) in order to lower the drainage pipe, and thereby, C, a truck driver of the instant truck, and D, a bicycle driver of the instant case, was in the state of leaving the view of the view of the instant bicycle driver.

2 The road of this case is a asphalt package with a limited speed of 60km, and approximately 4.1% down slope in the direction of running the truck of this case.