logobeta
본 영문본은 리걸엔진의 AI 번역 엔진으로 번역되었습니다. 수정이 필요한 부분이 있는 경우 피드백 부탁드립니다.
텍스트 조절
arrow
arrow
(영문) 창원지방법원 2014.11.07 2014고단1946
수질및수생태계보전에관한법률위반
Text

1. Defendant A shall be punished by a fine of 20,000,000 won, and Defendant B shall be punished by a fine of 10,000,000 won.

Defendant

A.

Reasons

Punishment of the crime

1. Defendant A and B Co., Ltd. (hereinafter “Defendant A, etc.”) are the representative director of Defendant A, and Defendant B Co., Ltd. (hereinafter “Defendant B”) is a corporation established for the purpose of washing and selling aggregate. A.

Defendant

A (1) If a person intends to install a facility that discharges wastewater in excess of 0.1 cubic meters of wastewater a day, which does not include specific substances harmful to water quality or heavy metal, while conducting sea sand screening and washing business falling under non-metallic mineral mining facilities, among wastewater discharge facilities, the person shall file a report on the installation of wastewater discharge facilities with the competent authority.

Nevertheless, the Defendant did not report to the competent authorities, and discharged, from February 14, 2013 to February 12, 2014, the total sum of 61,508 tons of wastewater generated by washing sea sand from the place of business located in Sungwon-si X in Changwon-si X without permission.

(2) On February 13, 2014, the Defendant, in collusion with K representative director, a company company preventing environmental pollution, intended to install wastewater preventive facilities and to install wastewater preventive facilities at a volume below the actual wastewater treatment capacity generated by having wastewater less installation quantity and wastewater generation volume. The above K, in preparing a report on the installation of wastewater discharge facilities, submitted the location of discharge facilities, the flow level of wastewater discharge facilities, the usage level of raw materials (including water used), the specifications of water-quality pollutants anticipated to occur in the process of discharging wastewater, the installation specifications of preventive facilities and their drawings, and the installation specifications and drawings of water-quality pollutants anticipated to occur in the submission of the report on the installation of the wastewater discharge facilities. However, even though the Defendant has accurately calculated the volume of water used and the quantity of wastewater generated before the installation of the wastewater discharge facilities, not the average of 324.8 cubic meters per day of the volume of water used before the installation of the wastewater discharge facilities, and calculated the volume of water used by 232 cubic meters (60 cubic meters/day of 72 cubic meters of water supply of water and water.).

arrow