(영문) 서울서부지방법원 2017.03.09 2016가단241327
구상금
Text

1. The Defendants: (a) KRW 35,352,734 to each Plaintiff, as well as KRW 5% per annum from July 25, 2015 to March 9, 2017.

Reasons

1. Facts of recognition;

A. On March 11, 2016, the Plaintiff entered into an insurance contract as an insurance company, and owned by C, transferred its ownership to E (Ah’s children) on the ground of donation.

Two insurance contracts were concluded with E with respect to buildings of reinforced concrete structure D, reinforced concrete structure, multi-unit house (multi-unit house), 137.72 square meters on the ground of Class II neighborhood living facilities, 126.66 square meters on the second floor, 126.6 square meters on the third floor, 126.6 square meters on the fourth floor, and 126.6 square meters on the fourth floor (hereinafter “instant buildings”).

1) A policyholder for comprehensive project support within dividends: Insurance coverage period of the first-third floor above ground among the instant buildings and the entire cover period of the household effects from January 6, 2012 to January 6, 2022: the amount of insurance coverage of the instant building: 300,000 to January 6, 202: the total insurance period of the household effects 10,000,000,000 for the household effects of the instant building: the total insurance period of the fourth floor above ground among the instant building and the parts thereof from January 6, 202 to January 6, 202: the total insurance period of the household effects within the instant building: 10,00,000,000 for the building, and 20,000,000 for the household effects of the instant building.

B. (1) The occurrence of a fire accident and the prevention of fire were carried out by Defendant A with the trade name of “F”, and the fire occurred while Defendant B received a subcontract for the 8,000,000 won of the cost of the construction from G awarded a contract for the interior interior interior interior interior interior interior of the shop of the first floor of the instant building, and employed Defendant B to do the sponsing work during the said sponsing work. (2) A around March 25, 2015, around 15:12, 2015, Defendant B carried out the sponsing work to cut part of the walls of the rear side of the building at the construction site at the above site and install a sponsing work to install a window at the above site.

The French road has been spreaded to the fourth floor on the outer wall of the building of this case, and it has been burned up to the inside of the fourth floor due to a studio, and it has been completely suppressioned at around 15:50.

(hereinafter “the instant fire”). At the time, the door door of the first floor of the instant building was opened, but the access road to the fourth floor is a brick.