(영문) 청주지방법원 2017.04.27 2015가단114111
손해배상(산)
Text

1. The Defendants jointly and severally against Plaintiff A, KRW 188,449,66, and KRW 5 million to Plaintiff B, and KRW 3 million to Plaintiff C, D, and E.

Reasons

1. Basic facts

A. On July 22, 2014, Defendant Daiam Industry Co., Ltd. (hereinafter “Defendant Daiam Industry”) entered into a contract with Defendant FF Co., Ltd. (hereinafter “Defendant FF”) to grant a contract by setting the construction cost of the extension of the Defendant Daiam Industry shipment warehouse (Adong; hereinafter “instant factory”) at the 471st day of Jinju-si (hereinafter “Defendant F”) from the date of Jinju-si to the date of Jinju-si, and the period from July 30, 2014 to August 29, 2014.

B. On April 1, 2014, the Defendant Hoam Industry entered into a contract with U.S. Co., Ltd. to manufacture concrete products on the basis of a free lease of the production facilities of the friendly industry to U.S. and supply the production facilities of the friendly industry directly required for the production of finished products.

C. Pursuant to each of the above contracts, around August 2014, at the instant factory, concrete products, such as friendly S electric poles, files, and asphalts, were manufactured, and Defendant F’s roof of the instant factory (30 meters extension work) was combined.

H as a Crecing engineer belonging to U.S., he was in charge of the operation of the factory of this case 10 tons of 10 tons of the factory of this case, and I, as an employee of Defendant F, was in charge of the safety management of the roof extension work of this case 30 meters extension work of the factory of this case, he maintained the work progress of the roof extension work of this case and played a role of signal number leading Defendant H, who is a Crecing engineer, to adjust the creck.

E. Around 11:00 on August 23, 2014, H was engaged in the work of operating a tent (10 tons) of the instant plant and carrying file and telegraphs produced in the instant plant to the cream onto the mobile vehicle. Around August 23, 2014, H is a knee who operates Plaintiff A’s left side knee with knee, who was undergoing C-type kne-VV in the ceiling.