(영문) 수원지방법원성남지원 2017.07.12 2016가단207774
손해배상(기)
Text

1. The Defendant’s KRW 5,00,000 as well as the annual rate of KRW 5% from April 7, 2016 to July 12, 2017 to the Plaintiff.

Reasons

1. Facts of recognition;

A. On March 20, 200, the Plaintiff entered into a lease agreement with the Defendant on the underground floor (hereinafter “instant lease agreement”) with respect to the building located in Seongbuk-gu, Seongbuk-gu, Sungnam-gu, Seoul (hereinafter “instant building”) owned by the Defendant, setting the lease deposit of KRW 7,00,000,000, monthly rent of KRW 500,000, and the lease period of April 20, 2001 (hereinafter “D factory”). On April 20, 200, the Plaintiff operated a double-end manufacturing factory (hereinafter “D factory”).

On April 15, 2006, the Plaintiff and the Defendant deducted the rent of 2,00,000,000 from the lease deposit for the fourth-month overdue interest of the Plaintiff, and then changed the lease deposit to 5,00,000 won, and the rent to 450,000 won per month.

B.1) On February 3, 2013, the Defendant newly created a room to set off part of the first floor of the instant building, and attached soundproof materials made by spunching into the walls of D factory by requesting a construction business operator E, etc. to prevent the noise of D factory in the room. 2) The Defendant thereafter leased the above first floor room to another person. Since the date following the leased date, the Defendant decided to install a spunch pipe, a spun pipe, and a spunching “cun” to ensure that the factory noise can take out the building, and then purchased the spunching pipe and a spunching pipe using the spune “cun” (spunch) to install the “cun” on April 11, 2013, and issued orders to purchase the spunching materials and the spunching materials in its original form as necessary.

3 E, upon the direction of the defendant, is being burned up with the cryp position panel's steel cutting work using the cryp position panel, due to the occurrence of the instantaneous flames caused by the cryp of the cryr's cryp, is being carried out, and then burning is carried out by the manufacturing machinery of the surrounding cryp.