logobeta
본 영문본은 리걸엔진의 AI 번역 엔진으로 번역되었습니다. 수정이 필요한 부분이 있는 경우 피드백 부탁드립니다.
텍스트 조절
arrow
arrow
(영문) 서울중앙지방법원 2017.04.14 2016가단5102774
건물명도
Text

1. The Defendant each indicated in the separate sheet No. 1, 2, 3, 4, 1 among the 20,664.13 square meters of the 1st floor of the building indicated in the separate sheet No. 1 list to the Plaintiff.

Reasons

1. Facts of recognition;

A. Since 202, the Plaintiff, as the owner of the building indicated in the attached Table 1 List, entered into a lease agreement on the building and site in the Dongjak-gu Seoul Metropolitan Government D market (hereinafter “D market”) with B (hereinafter “B”), and concluded a contract on the use of the facility management of the D market (excluding value-added tax) with B during the contract period from June 1, 2015 to May 31, 202, as between B and B on several occasions.

At the time of the above contract, the Plaintiff and B cooperate with each other as much as possible in promoting the D market modernization project, and the Plaintiff may undertake construction, such as removal, removal, extension, supplementation, and new construction of facilities, such as building structures, etc. for the modernization project, even during the contract period, and the Plaintiff agreed that the whole or part of the above contract may be terminated if necessary for the modernization project.

(hereinafter “instant market building lease agreement”). B.

After that, the construction of the modern market is completed and the occupancy date is set on March 15, 2016, the plaintiff and B confirmed on March 9, 2016 that the lease contract of the former market building was terminated as of March 15, 2016, the occupancy date of the modern market building, and agreed to enter into a new facility management contract on the modern market building.

As to the modern market building on the same day, the Plaintiff and B agreed to newly enter into a facility management use agreement, the main contents of which are the same as those of the existing contract, from March 15, 2016 to May 31, 2020, with respect to the term of the contract from March 15, 2016 to May 31, 2020.

(c) B is between the Defendant and the seller in the D market around 2014.

arrow