(영문) 수원지방법원 2018.08.22 2017가합16009
공사대금
Text

1. As to KRW 116,926,605 and KRW 72,120,00 among the Plaintiff, the Defendant shall pay to the Plaintiff KRW 44,806,605 from May 26, 2017.

Reasons

Basic Facts

3. Building area: 484.39 square meters (147 square meters);

4. Contract amount: Additional tax rate of KRW 529,200,000,000 per day (529,200,000).

In order to prepare the above, the owner shall be determined by B.

5. Period from June 13, 2016 to November 12, 2016.

6. It shall be determined by the addition to the non-sections of the drawing and beer.

7. (1) The term “B” shall take such adequate measures as the installation of safety facilities and the subscription to insurance, etc. to prevent industrial accidents.

In such cases, "A" shall include the amount equivalent to safety management expenses and insurance premiums in the contract amount.

10. (1) When the contents of the design document are inconsistent with the conditions of the construction site, or are unclear, omitted or erroneous, or when a situation in which the construction work was not scheduled occurs or the project plan is modified, the design shall be modified;

(2) Where an increase or decrease in construction volume occurs due to the modification of a design under paragraph (1), the contract amount shall be adjusted according to the following standards:

(Attachment) On June 12, 2016, the Plaintiff was awarded a contract with the Defendant for the construction of a multi-family house C ground unit in Suwon-si, Suwon-si, Suwon-si (hereinafter “instant construction”).

(hereinafter “instant contract”). The main contents of the instant contract are as follows.

The Plaintiff completed the instant construction and completed the completion inspection on November 24, 2016, and received KRW 510,000,000 as the construction price from the Defendant.

[Based on the fact that there is no dispute, Gap evidence Nos. 1, 16, Eul evidence Nos. 4, assertion of the purport of the whole pleadings, and the plaintiff's assertion of the judgment, the construction area under the contract of this case is 484.39 square meters (147 square meters) and the construction price is 582,120,000 won (per square year unit price x 3,600,000 x 147 square meters x 147 x 1.1 value added tax). Since the actual construction area increases to 601.80 cubic meters (182 square meters), the construction price also increased to 720,720,000 won (i.e., unit price 3,600,000 won per square year x 182 square meters x 182 square meters) pursuant to Article 10 of the contract of this case.

The plaintiff is the defendant.

arrow