(영문) 부산지방법원 2015.11.26 2015가단4715
손해배상(기)
Text

1. The Defendant’s KRW 15,144,400 as well as annual 5% from December 24, 2014 to November 26, 2015 to the Plaintiff.

Reasons

Basic Facts

The plaintiff is the owner of the first floor ( neighboring living facilities) and second floor (house) above ground (hereinafter referred to as the "house of this case") in Busan Seo-gu B.

From December 14, 2013 to October 2014, the Defendant newly built the business facilities and apartment houses of the first and second floors underground, and the second floor from December 14, 2013 to October 2014, on the land adjacent to the instant housing site.

(2) On February 26, 2014, the Defendant sent to the Plaintiff a content-certified mail to the effect that the Plaintiff would perform the following civil petition treatment measures: (a) the instant construction works are “instant construction”; and (b) the building constructed therefrom are “new building of this case.”

(A) Evidence No. 1; hereinafter referred to as "processing Measures in this case"). The problem treatment method is the cost of the construction, and around March 15, 2014, the existing fence fenced fenced, and the gate damaged due to the removal of the wall, the responsibility of the Defendant, at the time of completion of the installation of the frame for installation of the string of windows on each floor within one month from the time of the restoration to the original state, at the time of the occurrence of the problem, for the installation of the 2nd floor of the neighboring house and the installation of the 2nd floor of each floor; around March 15, 2014; around 30, around June 30, 2014, at the time of the completion of the installation of the 1st floor of the neighboring house and the installation of the 3nd floor of the 1st floor adjacent to the building at the time of the removal of the wall; the responsibility of the Defendant, at around September 30, 2014, facing the installation of the 2nd.

The plaintiff and the defendant are as follows on April 25, 2014.