logobeta
본 영문본은 리걸엔진의 AI 번역 엔진으로 번역되었습니다. 수정이 필요한 부분이 있는 경우 피드백 부탁드립니다.
텍스트 조절
arrow
arrow
(영문) 서울중앙지방법원 2018.06.29 2016가합564107
공사대금
Text

1. The Defendants jointly share KRW 561,173,285 with respect to the Plaintiff and the period from September 11, 2016 to June 29, 2018.

Reasons

Basic Facts

On August 2015, the Plaintiff was awarded a contract with D (the Defendant’s father, the Plaintiff’s father, and the Plaintiff’s punishment) for construction of a multi-family housing (living facilities and multi-household housing) on the land owned by the Defendants, Seocho-gu Seoul E, Seocho-gu, 286.9 square meters and F 9.5 square meters, which is owned by the Defendants.

(2) On August 2015, the Plaintiff and the Defendants prepared a construction contract with respect to the instant construction contract as a construction area of KRW 990.41 square meters (29.60 square meters), total construction amount of KRW 1,196,00,000 (=299 square meters x 4 million per square year, value added tax) and the main contents thereof are as follows.

1. Construction area: 20,000 square meters (6.01 square meters) on 19.87 square meters on 19.87 square meters on 20,000 won on 5 stories on each floor (6.01 square meters), additional 205.77 square meters on parking lots (62.25 square meters) on 208.5 square meters on the ground under separate contract (63.09 square meters) 3 stories on 208.65 square meters (5 square meters on 64.95 square meters) on 35.84 square meters on the ground (6 households) on 181.65 square meters on 20,000 (54.95 square meters on 6.84 square meters) on 20,000,0000 won on 29,0000,0000 residential houses (6.84 square meters on) on 20,0000 square meters on 176.4252 square meters on each 266.7.7.65 square meters (6.7.65.6.7.7.6

The first intermediate payment: Mazin 400,000,000 scin scin scin scin scin scin scin scin scins.

The second intermediate payment: 400 million won ( 400,000,000) shall be paid after the completion of the rooftop tower, tools, and tools.

arrow