(영문) 서울남부지방법원 2016.10.13 2014가합109540
손해배상(기)
Text

1. The Defendant’s KRW 215,869,411 as well as the Plaintiff’s KRW 5% per annum from October 7, 2012 to November 4, 2015.

Reasons

1. Basic facts

A. 1) The Plaintiff is a non-profit, non-profit, non-profit, and its location is specified according to the cadastral map attached to the appraiser J, Seoyang-gu, Yangyang-gu, and the appraiser J. The Plaintiff is a warehouse located in the area (hereinafter “instant warehouse”).

2) The Defendant is a person who operates a restaurant under the trade name of “F” in Gyeyang-gu, Gyeyang-gu, etc., and is a possessor of a cafeteria “F3” restaurant located in G and H (hereinafter “instant building”).

3) The instant building is a size of 263.43 square meters and 130 square meters of 263.43 square meters of the ground and underground floor of the relevant reinforced concrete structure and brick structure, and the instant warehouse is a size of 660 square meters of 1st floor of the sandd position panel, and its detailed location is indicated in attached Form 1. (b) An employee of the instant building where a fire occurred is indicated on October 7, 2012 (hereinafter “Defendant I”) at around 01:36 (hereinafter “ October 7, 2012”). The date is omitted when an indication is made on the date of “the date”.

3) The main room of the instant building (hereinafter “instant main room”)

) At the 119 Fire Report to the effect that the inspection was difficult, and was carried out by the Flue 119 Safety Center Fire Officers at the site around 01:41, and fire extinguishment was carried out until 03:35 (hereinafter referred to as the “instant fire”).

A) The fire of this case destroyed part of the kitchen and the building of this case, and part of the apartment table gate gate gate gate gate gate gate gate gate gate gate gate gate gate gate gate gate gate gate gate gate gate gate gate gate, house gate gate gate gate gate gate gate gate gate gate 1 as a result of the fire investigation on the cause of the fire of this case and the fire of this case gate gate 1 gate gate gate gate gate 50cm gate gate gate gate gate. The fire of this case gate gate gate gate gate gate gate gate gate gate gate gate gate 1, the building of this case and the building gate gate gate gate gate gate gate 1, the adjacent to the fire site.