Text
Defendant
A Imprisonment for 6 months, Defendant B's imprisonment for 8 months, and Defendant C's fine for 5,00,000 won.
Reasons
Punishment of the crime
The Defendants, Defendant C Co., Ltd. (hereinafter referred to as “C”) is a legal entity owner that mainly has its head office in Seongbuk-gu, Changwon-si, the main purpose of which is to engage in steel-rein concrete construction business, and F is the entity that manufactures and installs steel-rein structure (individual entity) located in Changwon-si G.
Defendant
C) On June 6, 2016, H Co., Ltd. awarded a contract for the construction of a new H factory (hereinafter “new construction of a new factory”) with H Co., Ltd., and around that time subcontracted the construction of the new construction of the new factory to F.
Defendant
A as a general manager of safety and health of the head of the site belonging to C, a person who supervisess and supervisess the overall affairs of the construction of the new factory, such as the construction and safety of the new construction of the factory, and Defendant B as the actual representative safety and health manager of F, who exercises overall control over the construction, safety, etc. of the new construction of the factory.
Specific facts of crime
1. From August 15, 2016 to August 21, 2016, Defendant A and Defendant B had the construction site of the instant plant located in Kimhae-si, and F’s employees, etc. engage in the construction work of the ground destruction, the building site distribution, the building site distribution, the basic concrete typology, and the construction work of a chip house.
The outer wall of this construction site was about 60 meters in length and 2.4 meters in height, which can be transferred according to work load, etc.
In such cases, Defendant A, a person in charge of safety and health management at the site of the construction site of the contractor, and Defendant B, a person in charge of safety and health management at the main site of the construction site of the subcontractor interest, shall prepare assembly drawings that include the materials of absence, distance, fixed method, etc. after the structural review of the structure with respect to the structure during the horizontal direction due to the wind load, the load load, the work load, etc. of the contractor.